My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-24_INSPECTION - C1982056
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
2011-10-24_INSPECTION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:17 PM
Creation date
11/8/2011 9:32:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Date
10/24/2011
Doc Name
Inspection Report
From
DRMS
To
Jerry Nettleton
Inspection Date
10/17/2011
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 17, 2011 C -1982- 056 /Foidel Creek Mine JDM <br />accompanied by Zach Trujillo of DRMS. Jerry Nettleton of TCC accompanied the inspection. Elizabeth Shaeffer <br />and Flvnn Dickenson of the Office of Surface Mining conducted a coal complete oversite inspection of the site. <br />The weather was clear and the ground was dry during the inspection. <br />PROCESSING WASTE /COAL MINE WASTE PILES — Rule 4.10 and 4.11 <br />Drainage Control; Surface Stabilization, Placement: <br />Refuse material continues to be placed in the RDA expansion area. Material has been stockpiled at the toe of the <br />RDA expansion area with grading being conducted during the inspection. The RDA was well compacted and <br />stable at the time of the inspection. The refuse material had not yet reached the head of the under -drain of the <br />RDA. The exposed under -drain was stable and built as designed. <br />RDA Expansion <br />ROADS — Rule 4.03; Construction 4.03.1(3)/4.03.2(3); Drainage 4.03.1(4)/4.03.2(4); Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6); Reclamation 4.03.1(7)/4.03.2(7): <br />The 6NM, 18LT, and Fish Creek Borehole access roads were dry at the time of the inspection. Access roads were <br />stable and in good condition at the time of the inspection. The construction of the 16LT utility borehole access <br />road was ongoing at the time of the inspection. No problems were noted and the road was within the approved <br />location as permitted under TR78. All roads were stable. <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 4 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.