Laserfiche WebLink
October 20, 2011 C- 1981 - 041 /Roadside Portals MPB <br />with no significant erosion or other stability problems identified in past inspections. Sediment Pond 47 has now <br />been fully reclaimed along with two sumps adjacent to the permanent channel and the 18 -inch v -ditch that directed <br />runoff to Pond 7. These reclaimed areas have been seeded and mulched. However, according to SCC shortly after <br />placing the mulch some strong winds blew a lot of it away. The mulch is somewhat sparse in the vicinity of Pond <br />7. SCC should monitor this and if necessary reapply mulch to the Pond 7 location. Photographs of before and <br />after reclamation are shown for both Ponds 7 and 8 at the end of this inspection report. SCC did a good job of <br />backfilling the ponds and returning the grade at both locations to the approximate original contour. <br />DOCUMENTS RECEIVED <br />None <br />OTHER (SPECIFY) <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 1 <br />Page 3 of 6 <br />