My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-31_INSPECTION - C1981041
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981041
>
2011-10-31_INSPECTION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:27 PM
Creation date
11/8/2011 7:42:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Inspection
Doc Date
10/31/2011
Doc Name
Inspection Report
From
DRMS
To
Snowcap Coal Company
Inspection Date
10/20/2011
Email Name
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 20, 2011 C- 1981 - 041 /Roadside Portals MPB <br />Inspection Topic Summary <br />NOTE: Y= Inspected N =Not Inspected R= Comments Noted V= Violation Issued NA Applicable <br />N - Air Resource Protection <br />N - Availability of Records <br />Y - Backfill & Grading <br />NA - Excess Spoil and Dev. Waste <br />NA - Explosives <br />N - Fish & Wildlife <br />R - Hydrologic Balance <br />Y - Gen. Compliance With Mine Plan <br />R -Other <br />N - Processing Waste <br />INTRODUCTION: <br />N - Roads <br />Y - Reclamation Success <br />N - Revegetation <br />N - Subsidence <br />N - Slides and Other Damage <br />N - Support Facilities On -site <br />N - Signs and Markers <br />NA - Support Facilities Not On -site <br />NA - Special Categories Of Mining <br />Y - Topsoil <br />COMMENTS <br />This was a partial inspection of the Roadside Portals Mine conducted on October 20, 2011 by Mike Boulay of the <br />Division of Reclamation, Mining and Safety Grand Junction Field Office. There was no operator representative <br />present during the inspection. Weather conditions were sunny and cool. Ground conditions were dry. <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, <br />4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2, Ground Water Monitoring 4.05.13; Surface Water Monitoring <br />4.05.13; Drainage — Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />With Technical Revision No. 61, the Division approved the removal of drainage control features at the South <br />Portal and North Decline including Sedimentation Ponds 7, 8 and 9. The focus of this partial inspection was to <br />view the reclamation work that has been recently completed at these locations. At the South Portal Snowcap Coal <br />Company, Inc. (SCC) has reclaimed Pond 8. Pond 8 received a small amount of discharge from the North <br />Collection Ditch which originates from the South Portals French Drain. In accordance with the Post Mining <br />Topography plan the flow from the North Collection Ditch is directed to a perimeter ditch at the base of the <br />Roadside South Refuse Disposal Area. The flow is estimated at about 2 gallons per minute and flows down to <br />Pond 9. The ditch was flowing at the time of the inspection. The flow just makes it to Pond 9 but there was no <br />accumulation of water in Pond 9 as a result of the discharge. Pond 9 has not yet been reclaimed and SCC is not <br />planning to reclaim Pond 9 this year. We will reevaluate reclaiming the pond next spring when we can detennine <br />what impact the outflow from the South Portals French Drain has and whether or not there is significant <br />accumulation in the pond resulting from the discharge. <br />At the North Decline Pond 7 never retained any water and the surrounding reclaimed areas are in good condition <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 1 <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.