My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-30_PERMIT FILE - C1980007A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2011-09-30_PERMIT FILE - C1980007A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:34 PM
Creation date
11/3/2011 4:58:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
9/30/2011
Doc Name
Cost Summary
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pagel of 3 <br />TRUCK/LOADER TEAM WORK <br />Task description: Load and haul demo'd concrete & asphalt f/ top of CPP fill to a fill area in main <br />surface facilities area <br />Site: West Elk Mine Permit Action: MR -374 Permit/Job #: C1980007 <br />PROJECT IDENTIFICATION <br />Task #: 37B State: Colorado <br />Date: 5/11/2011 County: Gunnison <br />User: TAK <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />DRMS <br />ipti <br />Abbreviation: None <br />Filename: C007 -37b <br />Shift basis: der day <br />Truck Loader Team - Truck: <br />Cat 773D (2002) <br />- Loader: <br />CAT 980G (2001) <br />Support Equipment -Load Area: <br />CAT 928G <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Truck/Loader Team Sunnort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $384.27 <br />MATERIAL QUANTITIES <br />Initial volume: 458 CCY Swell factor: 1.000 <br />Loose volume: 458 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 1 Pounds /LCY <br />Description: User Provided <br />Rated Payload: 122,260 Pounds <br />Payload Capacity: 122,260.00 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />100 <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$52.70 <br />$34.37 <br />$12.46 <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$100.70 <br />$59.55 <br />$25.04 <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$22.29 <br />$38.67 <br />$38.49 <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$175.69 <br />$132.59 <br />$75.99 <br />NA <br />NA <br />NA <br />Number of Units: <br />1 <br />1 <br />1 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $308.28 <br />Support: $75.99 <br />Maint: $0.00 <br />Total work team cost/hour: $384.27 <br />MATERIAL QUANTITIES <br />Initial volume: 458 CCY Swell factor: 1.000 <br />Loose volume: 458 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 1 Pounds /LCY <br />Description: User Provided <br />Rated Payload: 122,260 Pounds <br />Payload Capacity: 122,260.00 LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.