Laserfiche WebLink
Task description: <br />Site: West Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: 74A <br />Date: 5/11/2011 <br />User: TAK <br />UNIT COSTS <br />DEMOLITION WORK <br />Top of CPP: Demolish concrete and asphalt slabs, ST -4 armor <br />Permit Action: MR -374 Permit/Job #: C1980007 <br />State: Colorado <br />County: Gunnison <br />Agency or organization name: DRMS <br />Abbreviation: None <br />Filename: C007 -74a <br />Location adjustment: 91.30 % <br />Structure or Item <br />Demolition Menu <br />Description <br />Dimensions <br />Selection <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Cost <br />4 -inch thick asphalt <br />18590 sf (227 <br />Pavement, bituminous, <br />650.80 <br />SY <br />$6.41 <br />$4,171.63 <br />pad <br />cyds0 <br />demolition only - 4 in. to <br />6 in. thick <br />4 -inch thick <br />2810.5 (35 <br />Pavement, concrete, <br />312.30 <br />SY <br />$13.45 <br />$4,200.44 <br />reinforced concrete <br />cyds) <br />demolition only, to 6 in. <br />ad <br />thick - Rod reinforcing <br />8 -inch thick <br />5857.3 (145 <br />Pavement, concrete, <br />144.70 <br />CY <br />$112.00 <br />$16,206.40 <br />reinforced concrete <br />cyds) <br />demolition only, 7 in. to <br />pad <br />24 in. thick - Reinforced <br />Flow -fill concrete to <br />50' -long X 2 <br />Pavement, concrete, <br />51.00 <br />CY <br />$81.50 <br />$4,156.50 <br />armor ST -4 reclaim <br />demolition only, 7 in. to <br />tunnel <br />24 in. thick - No <br />reinforcing <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 13.12 (unadjusted): $28,734.97 location): $26,235.03 <br />