Laserfiche WebLink
93 <br />r <br />� MAIT- <br />Colorado Division of Reclamation, Mining and Safety <br />Reclamation Cost Summary of Only Items Not Previously Approved in PR -14 <br />Permit No. <br />C-80 -007 <br />Prepared by: TK Date: <br />12/14/2010 <br />Mine name: <br />West Elk <br />Job action: TR -123 County: <br />Gunnison <br />TASK LIST (DIRECT COSTS) <br />New Task no. <br />Task description <br />Form Task Hours <br />Used <br />Direct Cost <br />23A <br />ripper <br />4.46 <br />$3,774 <br />2-�g <br />ripper <br />4-24 <br />$1;126 <br />236 <br />deter <br />69 29 <br />$62,72 <br />239 <br />dozer <br />8,27 <br />$7,485 <br />23€ <br />reveg <br />12 89 <br />V 1,665 <br />23F <br />reveg <br />3-58 <br />$3,489 <br />23G <br />Rip MDW pads approved in TR -123 (not previously approved in PR -14) <br />ripper <br />0.00 <br />$0 <br />23H <br />Rip MDW roads approved in TR -123 (not previously approved in PR -14) <br />ripper <br />0.34 <br />$314 <br />231 <br />Regrade MDW pads approved in TR -123 (not previously approved in PR -14) <br />dozer <br />0.00 <br />$0 <br />23J <br />Regrade MDW roads approved in TR -123 (not previously approved in PR -14) <br />dozer <br />2.31 <br />$2,091 <br />23K <br />Revegetate MDW pads approved TR -123 (not previously approved PR -14) <br />dozer <br />0.00 <br />$0 <br />23L <br />Regrade MDW roads approved in TR -123 (not previously approved in PR -14) <br />reveg <br />0.50 <br />$972 <br />23M <br />hQFQhele <br />2079 <br />$47,540 <br />23N <br />Seal MDWs approved in TR -123 (not previously approved in PR -14) <br />borehole <br />0.00 <br />$0 <br />GRAND TOTAL DIRECT COSTS <br />3.15 <br />$3,377 <br />INDIRECT COSTS <br />Liability insurance: <br />2.02% % of direct costs <br />total = <br />$ 68 <br />Performance bond: <br />1.05% % of direct costs <br />total = <br />$ 35 <br />Job superintendent: <br />3.15 hrs. at $ 39.38 per hour <br />total = <br />$ 124 <br />Profit: <br />10.00% % of direct costs <br />total = <br />$ 338 <br />TOTAL O 8 P= <br />$ 565 <br />CONTRACT AMOUNT (direct + O 8 P)= <br />$3,942 <br />Financial warranty processing (legal /related costs): <br />NA <br />Engineering work and /or bid preparation: <br />4.25% % of contract <br />$ 168 <br />Reclamation management and /or administration: <br />5.00% % of contract <br />$ 197 <br />NA % of direct costs <br />Total indirect reclamation costs <br />$ 930 <br />Total performance bond amount (direct costs plus indirect costs) <br />$4,307 <br />7g, / -L3 / /a /il <br />