My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-01_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2011-08-01_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:36:13 PM
Creation date
11/3/2011 4:22:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
8/1/2011
Doc Name
Cost Summary
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GRAND TOTAL DIRECT COSTS 129.20 $137,797 <br />INDIRECT COSTS <br />Liability insurance: <br />2.02% <br />% of direct costs <br />total = <br />$ 2,783 <br />Performance band: <br />1.05% <br />% of direct costs <br />total = <br />$ 1,447 <br />Job superintendent: <br />Colorado Division of Reclamation, Mining and Safety <br />hrs. at $ 39.38 <br />per hour total = <br />6 <br />Reclamation Cost Summary of Only Items Previously Approved in PR -14 <br />10.00% <br />% of direct costs <br />Permit No. <br />C -80 -007 <br />Prepared by: TK Date: <br />12/14/2010 <br />Mine name: <br />West Elk <br />Job action: TR -123 County: <br />Gunnison <br />CONTRACT AMOUNT (direct + O 8 P)= <br />TASK LIST (DIRECT COSTS) <br />New Task no. <br />Task description <br />Form <br />Used <br />Task Hours <br />Direct Cost <br />23A <br />Rip MDW pads approved in TR -123 (previously approved in PR -14) <br />ripper <br />4.06 <br />$3,774 <br />23B <br />Rip MDW roads approved in TR -123 (previously approved in PR -14) <br />ripper <br />121 <br />$1,126 <br />23C <br />Regrade MDW pads approved in TR -123 (previously approved in PR -14) <br />dozer <br />69.29 <br />$62,727 <br />23D <br />Regrade MDW roads approved in TR -123 (previously approved in PR -14) <br />dozer <br />8.27 <br />$7,485 <br />23E <br />Revegetate MDW pads approved in TR -123 (previously approved in PR -14) <br />reveg <br />12.00 <br />$11,665 <br />23F <br />Revegetate MDW roads approved in TR -123 (previously approved in PR -14) <br />reveg <br />3.58 <br />$3,480 <br />236 <br />ripper <br />0,00 <br />$0 <br />2314 <br />ripper <br />044 <br />$314 <br />die <br />0-00 <br />$e <br />231 <br />deter <br />2-.34 <br />$2;091 <br />23K <br />de7er <br />0:00 <br />$0 <br />236 <br />reveg <br />0-0 <br />$974 <br />23M <br />Seal MDWs approved in TR -123 (previously approved in PR -14) <br />borehole <br />30.79 <br />$47,540 <br />2314 <br />bGFG iels <br />4,00 <br />$0 <br />GRAND TOTAL DIRECT COSTS 129.20 $137,797 <br />INDIRECT COSTS <br />Liability insurance: <br />2.02% <br />% of direct costs <br />total = <br />$ 2,783 <br />Performance band: <br />1.05% <br />% of direct costs <br />total = <br />$ 1,447 <br />Job superintendent: <br />129.20 <br />hrs. at $ 39.38 <br />per hour total = <br />$ 5,088 <br />Profit: <br />10.00% <br />% of direct costs <br />total = <br />$ 13,780 <br />TOTAL O 8 P= <br />$ 23,098 <br />CONTRACT AMOUNT (direct + O 8 P)= <br />$160,895 <br />Financial warranty processing (legal /related costs): NA <br />Engineering work and /or bid preparation: 4.25% % of contract $ 6,838 <br />Reclamation management and /or administration: 5.00% % of contract $ 8,045 <br />NA % of direct costs <br />Total indirect reclamation costs $ 37,981 <br />Total performance bond amount (direct costs plus indirect costs) $175,778 <br />
The URL can be used to link to this page
Your browser does not support the video tag.