My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-20_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2011-06-20_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:38 PM
Creation date
11/3/2011 4:11:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
6/20/2011
Doc Name
Cost Summary
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: West Elk Mine <br />COST SUMMARY WORK <br />CPP structures <br />Permit Action: MR -375 <br />PROJECT IDENTIFICATION <br />Task #: C75 State: Colorado <br />Date: 6/10/2011 County: Gunnison <br />User: TAK <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job #: C1980007 <br />Abbreviation: None <br />Filename: C007 -C75 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />75a <br />Demo structures approved in MR -375 <br />DEMOLISH <br />1 <br />0.00 <br />$2,070.87 <br />SUBTOTALS: <br />0 <br />$ $2,070.87 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 <br />Total = <br />$41.83 <br />Performance bond: 1.05 <br />Total = <br />$21.74 <br />Job superintendent: 1.04 <br />Total = <br />$60.90 <br />Profit: 10.00 <br />Total = <br />$207.09 <br />TOTAL O & P = <br />$331.56 <br />CONTRACT AMOUNT (direct + O & P) = <br />$2,402.43 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 <br />Total = <br />0.00 <br />Engineering work and/or contract/bid preparation: 4.25 <br />Total = <br />$102.10 <br />Reclamation management and/or administration: 5.00 <br />$120.12 <br />CONTINGENCY: 0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$553.78 <br />TOTAL BOND AMOUNT (direct + indirect) = <br />$2,624.65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.