Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 37B Page 3 of 3 <br />Haul Route- <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />1 <br />(Ft) <br />-1.00 <br />M <br />M <br />(fpm) <br />Time <br />min <br />1 <br />1400.00 <br />1.00 <br />3.00 <br />4.00 <br />3405 <br />5.444 <br />Haul Time: 5.444 minutes <br />Return Route- <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />M <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />1400.00 <br />-1.00 <br />3.00 <br />2.00 <br />3569 <br />0.579 <br />Loading Tool unit <br />Production 508.20 <br />Truck Unit Production <br />214.45 <br />Optimal No. of Trucks: 2 <br />Return Time: 0.579 <br />Total Truck Cycle Time: 12.323 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 177.99 <br />Adjusted single truck/loader team production: 177.99 <br />Adjusted multiple truck/loader team production: 177.99 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 2.57 <br />Unit cost: $2.159 /LCY Total job cost: $988.79 <br />minutes <br />minutes <br />421.80 LCY /Hour <br />177.99 LCY /Hour <br />1 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Hours <br />CIRCES Cost Estimating Software <br />