My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-20_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2011-06-20_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:38 PM
Creation date
11/3/2011 4:11:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
6/20/2011
Doc Name
Cost Summary
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatina Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 20L State : Colorado Permit/job# : C -80 -007 <br />Date <br />User <br />04/26/2010 <br />TA <br />Agency or organization name CDRMS <br />Permit or other job action : TR -120 <br />Task description: Grade RPEE haul roads to AOC <br />HOURLY EQUIPMENT COST <br />Basic machine Cat D9R - 9SU (2005) <br />Horsepower: <br />405 <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab <br />Shift basis: <br />1 per day <br />Attachment no. 2 : -shank ripper <br />Data source : <br />(CRG) <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $67 .84 NA <br />Operating cost/hour : $119.93 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $226.31 Total fleet cost/hour : <br />$905.25 <br />_._ _.. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 71,116 BCY factor : 1.330 volume: <br />94,584 <br />LCY <br />Source of estimated volume : 3.03 mi L X 30 ft W X 4 ft deep <br />Source of estimated swell factor : DRMS estimate <br />HOURLY PRODUCTION Job Condition Correction Factors <br />Source <br />Operator skill : <br />0.75 <br />(avg.) <br />Average push distance : 50 feet Material consistency : <br />1.00 <br />(Cat HB) <br />Unadjusted hourly production: 2,110.5 LCY /hr Dozing method: <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />(avg.) <br />Material consistency description : Job efficiency: <br />0.83 <br />(1shift1day) <br />Consolidated stockpile Spoil pile: <br />0.80 <br />(fnd -rt) <br />Push gradient : <br />0.83 <br />(Cat HB) <br />Average push gradient: 8.00 % (pos) Altitude : <br />1.00 <br />(Cat HB) <br />Average site altitude : 7,100 feet Material weight: <br />0.79 <br />(Cat HB) <br />Blade type : <br />1.00 <br />(S /SU /U) <br />Material weight: 2,900 Ibs /LCY Net correction : <br />0.33 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : <br />694.99 <br />LCY /hr <br />Adjusted fleet production : <br />2,779.98 <br />LCY /hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time: <br />34.02 <br />Hours <br />Unit cost: $0.326 /LCY Total job cost: <br />$30,800 <br />County : Gunnison <br />Site West Elk Mine <br />Abbreviation : none <br />Filename :C007 -20L <br />
The URL can be used to link to this page
Your browser does not support the video tag.