Laserfiche WebLink
User <br />TAK <br />Site West Elk Mine <br />Agency or organization name CDRMS <br />Permit or other job action : TR -120 <br />Task description Rip RPEE roads <br />. <br />HOURLY EQUIPMENT COST <br />Basic machine Cat D9R - 9SU (2005) Horsepower: 405 <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis: 1 per day <br />Attachment no. 2 : -shank ripper <br />Data source : (CRG) <br />Cost Breakdown: Ownership cost/hour : <br />Dozer operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />MATERIAL QUANTITIES <br />Filename :C007 -20K <br />Utilization % <br />$66.95 NA <br />$120.00 100 <br />$6.95 100 <br />$38.54 NA <br />$232.44 Total fleet cost/hour : $929.76 <br />Average ripping length : 500.00 feet/pass <br />Average dozer speed : 88.00 feet/minute <br />Average maneuver time: 0.25 minutes /pass <br />Job efficiency factor <br />Net job correction <br />0.83 (1 shift/day) <br />0.83 multiplier <br />Production per unit area : <br />0.891 <br />Selected estimating method : <br />Area <br />1,192.46 cu. yds. /hour <br />Alternate methods - <br />1,436.70 <br />cu. yds. /hour <br />Adjusted fleet production : <br />4,769.83 cu. yds. /hour <br />Seismic : NA NA <br />Load factor: <br />NA Bank volume: <br />NA <br />BCY <br />Area : 11.02 acres <br />Rip depth (ft) : <br />4.00 Volume: <br />71,116 <br />BCY or CCY <br />Source of estimated quantity 3.03 miles of road, 30 ft wide <br />$0.195 <br />per cu. yd. <br />Source of estimated load factor: NA <br />$13,862 <br />HOURLY PRODUCTION <br />Alternate methods - <br />Job Condition Corre Factors - <br />Seismic : Seismic velocity: NA <br />feet/second <br />Unadjusted production <br />Unadjusted production : NA <br />cu. yds. /hour <br />per selected method : <br />1,436.70 <br />cu. yds. /hour <br />Area : Avg. ripping depth : 1.00 <br />feet/pass <br />Site altitude : <br />7,100 <br />feet <br />Average ripping width : 7.67 <br />feet/pass <br />Altitude adjustment : <br />1.00 <br />(Cat HB) <br />Average ripping length : 500.00 feet/pass <br />Average dozer speed : 88.00 feet/minute <br />Average maneuver time: 0.25 minutes /pass <br />Job efficiency factor <br />Net job correction <br />0.83 (1 shift/day) <br />0.83 multiplier <br />Production per unit area : <br />0.891 <br />acres /hour <br />Adjusted unit production : <br />1,192.46 cu. yds. /hour <br />Unadjusted production : <br />1,436.70 <br />cu. yds. /hour <br />Adjusted fleet production : <br />4,769.83 cu. yds. /hour <br />JOB TIME AND COST <br />Fleet size : <br />4 <br />dozer(s) <br />Total job time : <br />14.91 hours <br />Unit cost: <br />$0.195 <br />per cu. yd. <br />Total job cost: <br />$13,862 <br />