Laserfiche WebLink
REMOVE CONVEYOR EXTENSION <br />The RDA conveyor belt extension consists of 36" elevated structure on concrete footings <br />at 40 ft spacing. The entire length is 600ft. Detail of the RDA area is shown on Map 24. <br />RDA Extension Conveyor <br />Item <br />36" <br />Length (ft) <br />600 <br />Width (ft) <br />6 <br />Depth /height (ft) <br />6 <br />Quantity <br />600 <br />Units <br />LF <br />Unit cost including concrete demolition <br />21.5 <br />Total direct cost <br />$12,900 <br />Job supervision hours <br />2 <br />Job supervision cost <br />$83 <br />Profit, insurance, and bond @12.60% <br />$1,625 <br />Contract = Direct + Overhead <br />$14,609 <br />Engineering @4.25% of Contract <br />$621 <br />Reclamation management @6.0% of <br />Contract <br />$877 <br />Estimated bond <br />$16,106 <br />REMOVE CULVERTS <br />There are two culverts C -57 and C -58 that will be placed to route the diversion. C -57 is <br />designated in TR -38 as 48" diameter CMP 25 ft long. C -58 is designated as 12" diameter CMP <br />19 ft long. The culverts are shown on Map 24. <br />Remove Culverts <br />Item <br />Culverts <br />Culverts <br />Length (ft) <br />25 <br />19 <br />Diameter (in) <br />48 <br />12 <br />Quantity <br />2 <br />19 <br />Units <br />LF <br />LF <br />Unit cost <br />6.19 <br />3.15 <br />Total direct cost <br />$12 <br />$60 <br />Job supervision hours <br />2 <br />0 <br />Job supervision cost <br />$83 <br />$0 <br />Profit, insurance, and bond @12.60% <br />$2 <br />$8 <br />Contract = Direct + Overhead <br />$97 <br />$67 <br />Engineering @4.25% of Contract <br />$4 <br />$3 <br />Reclamation management @6.0% of <br />Contract <br />$6 <br />$4 <br />Estimated bond <br />$107 <br />$74 <br />TR -56 Exhibit 28- Page 175 04111 <br />