My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-26_PERMIT FILE - C1981012A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2011-09-26_PERMIT FILE - C1981012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:23 PM
Creation date
11/3/2011 12:17:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
9/26/2011
Doc Name
Bond Calculations (TR54, TR53, PR3, TR55, TR56 PR3)
Section_Exhibit Name
Exhibit 28 Appendix B Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Elk Coal Company <br />Permit C- 1981 -012 <br />TR 56 <br />This document estimates the bonding required to reclaim the RDA conveyor belt <br />extension as shown on Map 24 RDA and on Map 11 Sheet 3 East Portal Facilities. <br />The removal of the 600 ft 36 "conveyor belt extension and the removal of the two culverts <br />required to cross the diversion ditch are included in this estimate. <br />The following pages detail the cost estimate. In summary, the estimate is: <br />Total direct cost <br />$12,972 <br />Job supervision hours <br />4 <br />Job supervision cost <br />$167 <br />Profit, insurance, bond <br />$1,635 <br />Contract <br />$14,773 <br />Engineering <br />$628 <br />Reclamation management <br />$886 <br />Estimated bond <br />$16,288 <br />TR -56 Exhibit 28- Page 174 04/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.