Laserfiche WebLink
New Elk Coal Company <br />Permit C- 1981 -012 <br />TR 56 <br />This document estimates the bonding required to reclaim the RDA conveyor belt <br />extension as shown on Map 24 RDA and on Map 11 Sheet 3 East Portal Facilities. <br />The removal of the 600 ft 36 "conveyor belt extension and the removal of the two culverts <br />required to cross the diversion ditch are included in this estimate. <br />The following pages detail the cost estimate. In summary, the estimate is: <br />Total direct cost <br />$12,972 <br />Job supervision hours <br />4 <br />Job supervision cost <br />$167 <br />Profit, insurance, bond <br />$1,635 <br />Contract <br />$14,773 <br />Engineering <br />$628 <br />Reclamation management <br />$886 <br />Estimated bond <br />$16,288 <br />TR -56 Exhibit 28- Page 174 04/11 <br />