Laserfiche WebLink
• <br />• <br />Hayden Gulch Loadout <br />Response to Adequacy Comments <br />Page 2 <br />Response: Exhibits 3 -1, Surface Ownership and 3 -1A, Easements have been revised. <br />Exhibit 3 -2, Mineral Ownership and Control should be removed from the permit documents <br />since the Hayden Gulch Loadout and TAHR are surface operations only. <br />4. Approved Exhibit 4 -1 Land Use and Exhibit 4 -2 Pre - Mining Topography do not include the <br />land use and pre- mining topography associated with the proposed TAHR. Please provide <br />new or revised exhibits that reflect the land use and pre - mining topography based on the <br />proposed revised permit boundary with the inclusion of the TAHR area. <br />Response: New Exhibit 4 -1 Land Use (sheet 2), shows the TAHR permit area with land use <br />and pre - mining information. This exhibit has been copied from the II -W permit. <br />5. The proposed Status Update for insertion in front of Tab 1 states that, "The Hayden Gulch <br />Loadout remains designated as a coal handling facility in temporary cessation as of August <br />30, 2005. " As of July 5, 2011 and due to the initiation of reclamation activities the <br />designation of the Hayden Gulch Loadout has been changed to Active. Please revise the <br />proposed Status Update to reflect the current status of the Hayden Gulch Loadout. <br />Response: The Status Update has been revised. <br />• 6. Page 6, Tab 1 lists revisions approved since May 1993. Five revisions have been submitted, <br />with three being approved since the final entry of RN3 in 1997. Please revise page 8 to <br />include all revisions associated with the HGT permit. <br />Response: The original submittal included an updated page 8, but we have included another <br />copy of page 8 in this submittal also. <br />7. Page 5 of Tab 6 identifies site specific geology for the Hayden Gulch Terminal permit area <br />with reference to Figure 6 -3 Site Specific Geology. There is no mention of the TAHR area in <br />the approved text. In addition, approved Figure 6 -3 does not include the TAHR area as part <br />of the geology associated with the permit area. Please ensure that the data in the site <br />specific geology text is accurate for the TAHR and please revise Figure 6-3 to include the <br />TAHR area. <br />Response: Digital copies of most of the HGT permit maps and figures do not exist. So <br />instead of updating Figure 6 -3, HGT is including Exhibit 6 -1A, Site Specific Geology Tie <br />Across Haul Road Corridor (from the II -W permit) for insertion into the HGT permit. The <br />page 6 text has also been updated. <br />8. Appendix 7 -3 in Tab 7 lists Groundwater Wells in the Vicinity of the Permit Area. With the <br />proposed addition of the TAHR into the Hayden Gulch Loadout permit, the list in Appendix <br />7 -3 may have changed Additional wells may need to be included in Appendix 7 -3 to reflect <br />an accurate accounting of the groundwater wells in the vicinity. Please update Appendix 7- <br />3 to reflect the accurate number of groundwater wells located within the vicinity of the <br />proposed revised permit boundary. <br />