Laserfiche WebLink
Page 1 of 2 <br />SCRAPER TEAM WORK <br />Task description: Haul 102,450 Cu yd. Topsoil to long -term spoil pile area <br />Site: Keenesburg Strip Mine Permit Action: RN6 Permit/Job #: C1981028 <br />PROJECT IDENTIFICATION <br />Task #: 010 State: Colorado <br />Date: 8/16/2011 County: Weld <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 637G <br />- Dozer: NA <br />Abbreviation: None <br />Filename: CO28 -010 <br />COSTShift basis: 1 per day <br />Support Equipment -Load Area: I Cat D9R - 9SU (2005) <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: I CAT 14H <br />-Water Truck: Water Tanker, 3,500 Gal. <br />Cost Breakdown: <br />Scraper Work <br />Scraper <br />Team <br />Dozer <br />support hqutpment <br />Load Area <br />Dump Area <br />tviau1LV11aiitc <br />Motor Grader <br />L,4UIViiic11L <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />100 <br />NA <br />100 <br />100 <br />Ownership cost/hour: <br />$91.74 <br />NA <br />$49.19 <br />NA <br />$34.52 <br />$10.94 <br />Operating cost/hour: <br />$202.41 <br />NA <br />$117.89 <br />NA <br />$55.73 <br />$30.32 <br />Ripper op. cost/hour: <br />NA <br />NA <br />$0.00 <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$38.67 <br />NA <br />$38.49 <br />NA <br />$38.49 <br />$38.70 <br />Unit Subtotals: <br />$332.82 <br />NA <br />$205.56 <br />NA <br />$128.74 <br />$79.96 <br />Number of Units: <br />4 <br />0 <br />1 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,331.28 <br />Support: <br />$205.56 <br />1 Maint: <br />$208.70 <br />Total work team cost/hour: $1.745.54 <br />MATERIAL OUANTITIES <br />Initial volume: 102,450 CCY Swell factor: 1.060 <br />Loose volume: 108,597 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,8501bs /LCY <br />Material description: <br />Sand - Damp <br />Rated Payload: <br />75,000 pounds <br />Payload Capacity: <br />26.32 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />26.32 <br />LCY <br />CIRCES Cost Estimating Software <br />