My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-07_PERMIT FILE - C1981028A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981028A
>
2011-09-07_PERMIT FILE - C1981028A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:58 PM
Creation date
11/2/2011 3:21:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028A
IBM Index Class Name
Permit File
Doc Date
9/7/2011
Doc Name
Miscellaneous - Includes Reclamation Cost Estimate
Section_Exhibit Name
APPENDIX S MISCELLANEOUS
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTOR GRADER WORK <br />Task description: Final grade 49 acres long term spoil area <br />Site: Keenesburg Strip Mine Permit Action: RN6 Permit/Job #: C1981028 <br />PROJECT IDENTIFICATION <br />Task #: 009 State: <br />Date: 8/19/2011 County: <br />User: JHB <br />Colorado <br />Weld <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Abbreviation: None <br />Filename: CO28 -009 <br />Basic Machine: CAT 14H Horsepower: <br />Ripper Attachment: Multi -Shank Ripper Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />Selected Application: <br />Selected Blade Angle: <br />Effective Blade Length: <br />Width of blade overlap per pass: <br />Net grading or ripping width per pass: <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />Utilization % <br />$38.08 NA <br />$55.73 100 <br />$0.00 0 <br />$38.86 NA <br />$132.67 <br />$136.21 <br />49.00 <br />2010 ARR <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.90 (1sh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 <br />1.25 <br />Fini <br />30 <br />12.10 <br />2.00 <br />10.10 <br />1.5303 <br />215 <br />1 per day <br />(CRG) <br />mph <br />sh grading (0 -2.5 mph) - 1.25 <br />degrees <br />feet <br />feet <br />feet <br />acres /hour <br />Site Altitude: 4000 feet <br />1.3773 <br />1.3773 <br />Grader(s) Total job time <br />acres <br />acres/Hour <br />acres/Hour <br />35.58 Hours <br />Unit cost: $96.33 per acre Total job cost: $4,720.00 <br />CIRCES Cost Estimating5oftware <br />
The URL can be used to link to this page
Your browser does not support the video tag.