Laserfiche WebLink
DLLLIUULCr W Or"JUCCL %-011L U 1 asK ff uu/. rage L OI L <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Source <br />0.750 <br />(AVG.) <br />0.900 <br />CAT HB <br />1.000 <br />GEN. <br />1.000 <br />AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />0.786 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3058 <br />Adjusted unit production: 214.06 LCY /hr <br />Adjusted fleet production: 214.06 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.928/LCY <br />Total job time: <br />Total job cost: <br />199.71 Hours <br />$39,656.05 <br />CIRCES Cost Estimating Software <br />