My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-29_PERMIT FILE - C1983059 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1983059
>
2011-08-29_PERMIT FILE - C1983059 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:44 PM
Creation date
11/2/2011 9:51:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
Permit File
Doc Date
8/29/2011
Doc Name
Bond Calculations Exhibit 10
Section_Exhibit Name
Exhibit 10 Bond Calculations
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Terror Creek Loadout <br />rags i OIL <br />BULLDOZER WORK <br />Backfill Coal Pad <br />Permit Action: 2011 Midterm Review Permit/Job #: C1983059 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: <br />Date: 29- Apr -11 County: <br />User: JRS <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />HOURLY EOU <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat D9R - 9SU (2005) <br />405 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Abbreviation: None <br />Filename: C059 -002 <br />Total unit Cost/Hour: $198.57 <br />Total Fleet Cost/Hour: $198.57 <br />MATERIAL QUANTITIES <br />Utilization % <br />Ownership Cost/Hour: <br />$49.19 <br />NA <br />Operating Cost/Hour: <br />$110.89 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $198.57 <br />Total Fleet Cost/Hour: $198.57 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />38,000 <br />Swell factor: <br />1.125 <br />Loose volume: <br />42,750 LCY <br />Source of estimated volume: Maps 5, 12 and 13 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />200 feet <br />700.0 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />10% <br />5,800 feet <br />2,6501bs /LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.