Laserfiche WebLink
Demo Worksheet Cont'd Task # 015 Page 3 of 5 <br />- Pad <br />12'x10'x8" <br />Demo. and on -site <br />120.00 <br />SF <br />$2.14 <br />$256.80 <br />disposal in excavated <br />pit, 8 in. thick - Max. <br />200 ft. push <br />Secondary Screener <br />36'x9'xl4' <br />Bldg. (MN) demo. /on- <br />4,536.00 <br />CF <br />$0.20 <br />$898.13 <br />site disposal in <br />excavated pit - Max. <br />200 ft. push <br />- Pad <br />40'xl4'x8" <br />Demo. and on -site <br />560.00 <br />SF <br />$2.14 <br />$1,198.40 <br />disposal in excavated <br />pit, 8 in. thick - Max. <br />200 ft. push <br />Secondary Stacker to <br />110'x3'x30' <br />Bldg. (MN) demo. /on- <br />9,900.00 <br />CF <br />$0.20 <br />$1,960.20 <br />Reclaim <br />site disposal in <br />excavated pit - Max. <br />200 ft. push <br />- Footing <br />1.5'x3'x50 LF <br />Demo. and on -site <br />50.00 <br />LF <br />$14.47 <br />$723.50 <br />disposal in excavated <br />pit, 1.5 ft. x 3 ft. - Max. <br />200 ft. push <br />Secondary Stacker to <br />100'x3'x10' <br />Bldg. (MN) demo. /on- <br />3,000.00 <br />CF <br />$0.20 <br />$594.00 <br />Pile <br />site disposal in <br />excavated pit - Max. <br />200 ft. push <br />- Footing <br />1.5'x3'x50 LF <br />Demo. and on -site <br />50.00 <br />LF <br />$14.47 <br />$723.50 <br />disposal in excavated <br />pit, 1.5 ft. x 3 ft. - Max. <br />200 ft. ush <br />Primary Stacker to <br />100'x3'x10' <br />Bldg. (MN) demo. /on- <br />3,000.00 <br />CF <br />$0.20 <br />$594.00 <br />Lump Pile <br />site disposal in <br />excavated pit - Max. <br />200 ft. push <br />- Footing <br />1.5'x3'x50 LF <br />Demo. and on -site <br />50.00 <br />LF <br />$14.47 <br />$723.50 <br />disposal in excavated <br />pit, 1.5 ft. x 3 ft. - Max. <br />200 ft. push <br />Truck Dump <br />24'x1,8'xl4' <br />Bldg. (MN) demo./on- <br />6,048.00 <br />CF <br />$0.20 <br />$1,197.50 <br />site disposal in <br />excavated pit - Max. <br />200 ft. push <br />CMP #2 <br />12 "x25 LF <br />Pipe, corrugated metal <br />25.00 <br />LF <br />$2.19 <br />$54.75 <br />(CMP) - 12 in. <br />diameter pipe <br />CMP #3 'and CMP #4 <br />18 "x95 LF <br />Pipe, corrugated metal <br />95.00 <br />LF <br />$2.34 <br />$222.30 <br />(CMP) - 18 in. <br />diameter pipe <br />Principle Spillway at <br />12 "x80 LF <br />Pipe, corrugated metal <br />80.00 <br />LF <br />$2.19 <br />$175.20 <br />Sediment Pond <br />(CMP) - 12 in. <br />diameter pipe <br />Truck Dump to <br />180 LF <br />Conveyor, overland, <br />180.00 <br />LF <br />$16.71 <br />$3,007.80 <br />Primary Conveyor <br />including supports - 5 <br />ft. W x 6 ft. H housing <br />Primary to Secondary <br />80 LF <br />Conveyor, overland, <br />80.00 <br />LF <br />$16.71 <br />$1,336.80 <br />Conveyor <br />including supports - 5 <br />ft. W x 6 ft. H housing <br />Primary to Transfer <br />100 LF <br />Conveyor, overland, <br />100.00 <br />LF <br />$16.71 <br />$1,671.00 <br />Conveyor <br />including supports - 5 <br />ft. W x 6 ft. H housing <br />CIRCES Cost Estimating Software <br />