Laserfiche WebLink
Demo Worksheet Cont'd Task # 015 Page 4 of 5 <br />Crusher to Secondary <br />80 LF <br />Conveyor, overland, <br />80.00 <br />LF <br />$16.71 <br />$1,336.80 <br />Conveyor <br />including supports - 5 <br />ft. W x 6 ft. H housing <br />Secondary to <br />46 LF <br />Conveyor, overland, <br />46.00 <br />LF <br />$16.71 <br />$768.66 <br />Transfer Conveyor <br />including supports - 5 <br />ft. W x 6 ft. H housing <br />Reclaim Conveyor <br />60 LF <br />Conveyor, overland, <br />60.00 <br />LF <br />$16.71 <br />$1,002.60 <br />including supports - 5 <br />ft. W x 6 ft. H housing <br />Reclaim to Transfer <br />100 LF <br />Conveyor, overland, <br />100.00 <br />LF <br />$16.71 <br />$1,671.00 <br />Conveyor <br />including supports - 5 <br />ft. W x 6 ft. H housing <br />Transfer to Loadout <br />100 LF <br />Conveyor, overland, <br />100.00 <br />LF <br />$16.71 <br />$1,671.00 <br />Conveyor <br />including supports - 5 <br />ft. W x 6 ft. H housing <br />- Conveyor Footings <br />2'xFx14 LF <br />Demo. and on -site <br />14.00 <br />LF <br />$6.43 <br />$90.02 <br />disposal in excavated <br />pit, 1.0 ft. x 2 ft. - Max. <br />200 ft. push <br />Railroad Track <br />1,650 LF <br />Railroad track - Ties <br />1,650.00 <br />LF <br />$8.57 <br />$14,140.50 <br />and track <br />- Ballast <br />1,100 CY <br />Railroad track - Ballast <br />1,100.00 <br />CY <br />$4.12 <br />$4,532.00 <br />Substation Fencing <br />164 LF <br />Fencing, chain link, <br />164.00 <br />LF <br />$2.74 <br />$449.36 <br />including posts and <br />fabric - 8 ft. to 10 ft. <br />high <br />Retaining Wall <br />272'x7.5'x12" <br />Demo. and on -site <br />2,040.00 <br />SF <br />$3.54 <br />$7,221.60 <br />disposal in excavated <br />pit, 12 in. thick - Max. <br />200 ft. push <br />- Footing <br />1'x2'x128 LF <br />Demo. and on -site <br />128.00 <br />LF <br />$6.43 <br />$823.04 <br />disposal in excavated <br />pit, 1.0 ft. x 2 ft. - Max. <br />200 ft. push <br />Concrete Sump <br />36.5'x36.5'x6" <br />Demo. and on -site <br />1,332.00 <br />SF <br />$1.61 <br />$2,144.52 <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />Powerlines and Poles <br />1,115 LF <br />Powerline or telephone <br />1,115.00 <br />LF <br />$2.60 <br />$2,896.77 <br />line, overhead, wood - <br />Sin le p ole <br />Coal Loadout Bin <br />10'x6'x12' <br />Bldg. (SN) demo. /on- <br />720.00 <br />CF <br />$0.17 <br />$123.12 <br />site disposal in <br />excavated pit - Max. <br />200 ft. push <br />Road Pavement <br />300'x24'x6" <br />Pavement, bituminous, <br />800.00 <br />SY <br />$6.41 <br />$5,128.00 <br />demolition only - 4 in. <br />to 6 in. thick <br />- Guard Rails <br />1,140 LF <br />Railing, roadside <br />1,140.00 <br />LF <br />$11.04 <br />$12,585.60 <br />guiderail and posts <br />(posts on 20 ft. centers) <br />Stoker Oil Building <br />10'x10'x110' <br />Bldg. (SN) demo. /on- <br />1,000.00 <br />CF <br />$0.17 <br />$171.00 <br />Expansion <br />site disposal in <br />excavated pit - Max. <br />200 ft. push <br />- Pad <br />10'x 10'x4" <br />Demo. and on -site <br />100.00 <br />SF <br />$1.07 <br />$107.00 <br />disposal in excavated <br />pit, 4 in. thick - Max. <br />200 ft. push <br />C[RCES Cost Estimating Software <br />