My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-20_PERMIT FILE - C1982056A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2011-06-20_PERMIT FILE - C1982056A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:39 PM
Creation date
11/1/2011 2:35:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
6/20/2011
Section_Exhibit Name
2.03 Legal, Financial, Compliance and Related Information
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
deny mining and knowingly waive that right.. The waiver must be knowingly made and separate from a lease or <br />. deed unless the lease or deed contains an explicit waiver. <br />RESPONSE <br />There are no surface mining activities or surface operations or facilities located within 300 feet measured <br />horizontally of any occupied dwelling planned under permit revision number 03-06. <br />RULE 2.03.8 - PERMIT TERM INFORMATION <br />(1) Each application for surface mining activities shall state the anticipated or actual starting and <br />termination date of each phase of the surface mining activities and the anticipated number of acres of land to be <br />affected for each phase of mining and over the total life of the permit. <br />(2) Each application for underground mining activities shall state the anticipated or actual starting date <br />and termination date of each phase of the underground mining activities and the anticipated number of acres of <br />surface lands to be affected, and the horizontal and vertical extent of proposed underground mine workings, for <br />each phase of mining and over the total life of the permit. <br />RESPONSE <br />See Map 23, Mine Plan, for actual starting and termination dates and horizontal extent of each phase of the <br />underground mining activities planned. The number of acres of surface lands to be affected may be found <br />on page 3, number 15 of the "Application Form for a Permit to Conduct Coal Mining in Colorado" <br />following the cover page of this application. <br />EASTERN MINING DISTRICT <br />Please refer to Map 23 for the starting and termination dates of the panels within the Eastern Mining District. It <br />should be noted that the gate road development will be in advance of the panel to be longwall mined, and typically <br />the mine plans to be one to two years ahead with its development work. The number of acres of surface lands to be <br />affected is identified on the permit application. New surface disturbance resulting from the Eastern Mining <br />District is associated with the construction of the dewatering and ventilation facilities and their roads. <br />EMD (Panels 2 Right through 6 Right) (PR 97-04) <br />Please refer to Map 23 for the starting and termination dates of the panels within the Eastern Mining District. It <br />should be noted that the gateroad development will be in advance of the panel to be longwall-mined. Also, the <br />mining of the main and submains in this district will be in advance of the longwall panels and gateroad <br />development. The number of acres of surface lands to be affected is identified in the permit application. <br />NMD (Panels 12 Right through 16 Right) (PR 99-05) <br />Please refer to Map 23 for the starting and termination dates of the panels within the Northern Mining District. h <br />should be noted that the gateroad development will be in advance of the panel to be longwall-mined. Also, the <br />mining of the Northeast Mains in this district will be in advance of the longwall panels and gateroad development. <br />The number of acres of surface lands to be affected is identified in the permit application. <br />NMD (Panels 17 Right through 21 Right) (PR 03-06) <br />Please refer to Map 23 for the starting and termination dates of the panels within the Northern Mining District. It <br />should be noted that the gateroad development will be in advance of the panel to be longwall-mined. Also, the <br />• mining of the Northeast Mains in this district will be in advance of the longwall panels and gateroad development. <br />The number of acres of surface lands to be affected is identified in the permit application. <br />PR 03-06 2.03-35 03/02/04
The URL can be used to link to this page
Your browser does not support the video tag.