Laserfiche WebLink
CLIMAX MINE FINANCIAL WARRARECLAMATION COST ESTIMATE <br /> 0 <br /> 4.15 EARTHWORK & FLOOD CONTROL - ARKANSAS RIVER CHANNEL <br /> PLAN SURFACE DISTURBANCE (ACRES) = 66.0 <br /> .. .� 5.. •� "as 7`- - ° . .;.r a �: ~`� n rs `6. <br /> PIR <br /> TASKS: <br /> Reconstruct stream channel through Storke Yard. <br /> Finish grade reconstructed Arkansas River channel. <br /> Place riprap in transition areas of new Arkansas River channel. <br /> Place riprap bedding in new Arkansas River channel. <br /> Flood control drainage from Arkansas River channel. <br /> Reconstruct � Finish Place Rip Rap Place Rip Rap Flood Control TOTAL COSTS� p P r ; P P_ � - , <br /> Chann Grade $ In Transitions In New Channel Draina e /� <br /> Equipment 350 1 i 14G N/A N/A N/A <br /> Excavator Grader <br /> Time Required(hours) 311.014 24.53 ------ ------ ----- ------ <br /> Area Reclaimed(acres) ---'--- --- -+ ---- ------ ------ <br /> ---- <br /> i <br /> Unit Cost II <br /> Equipment($/hour) $215 4i $76 29' --, -- ------ <br /> Labor($/hour) 1 $46 60, $2312` ------ <br /> Labor <br /> Other Cost - --- ---- ...$14a664 $2,482 00 $791250 00 ------ <br /> �2�2��� �9R•�fI 1, , j <br /> Subtotal Equipment Cost $67,022.90 $1,871.39�, -----�1, ---- ---- $68,894.29 <br /> Subtotal Labor Cost $14,494.46, $567.13 ---- ------ --- $15,061.60 <br /> Subtotal Other Cost ------ ' ----- $14,664.00 i $2,482.00 $791,250.00; $808,396.00 <br /> $892,351.89 <br /> TOTAL TASK COST $81,517 $2,439 $14,664 $2,482 $791,250 <br /> TOTAL TASK COST-MULTIPLE EQUIPMENT <br /> Golder Associates Inc. 983-2460 <br /> 2/5/99 FRED R.BANTA,INC. 73 <br />