My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-02-05_HYDROLOGY - M1977493
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977493
>
1999-02-05_HYDROLOGY - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 4:27:50 PM
Creation date
11/1/2011 7:29:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
HYDROLOGY
Doc Date
2/5/1999
Doc Name
Water Treatment Facility Area
From
Climax
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLIMAX MINE FINANCIAL WARRARECLAMATION COST ESTIMATE <br /> 0 <br /> 4.15 EARTHWORK & FLOOD CONTROL - ARKANSAS RIVER CHANNEL <br /> PLAN SURFACE DISTURBANCE (ACRES) = 66.0 <br /> .. .� 5.. •� "as 7`- - ° . .;.r a �: ~`� n rs `6. <br /> PIR <br /> TASKS: <br /> Reconstruct stream channel through Storke Yard. <br /> Finish grade reconstructed Arkansas River channel. <br /> Place riprap in transition areas of new Arkansas River channel. <br /> Place riprap bedding in new Arkansas River channel. <br /> Flood control drainage from Arkansas River channel. <br /> Reconstruct � Finish Place Rip Rap Place Rip Rap Flood Control TOTAL COSTS� p P r ; P P_ � - , <br /> Chann Grade $ In Transitions In New Channel Draina e /� <br /> Equipment 350 1 i 14G N/A N/A N/A <br /> Excavator Grader <br /> Time Required(hours) 311.014 24.53 ------ ------ ----- ------ <br /> Area Reclaimed(acres) ---'--- --- -+ ---- ------ ------ <br /> ---- <br /> i <br /> Unit Cost II <br /> Equipment($/hour) $215 4i $76 29' --, -- ------ <br /> Labor($/hour) 1 $46 60, $2312` ------ <br /> Labor <br /> Other Cost - --- ---- ...$14a664 $2,482 00 $791250 00 ------ <br /> �2�2��� �9R•�fI 1, , j <br /> Subtotal Equipment Cost $67,022.90 $1,871.39�, -----�1, ---- ---- $68,894.29 <br /> Subtotal Labor Cost $14,494.46, $567.13 ---- ------ --- $15,061.60 <br /> Subtotal Other Cost ------ ' ----- $14,664.00 i $2,482.00 $791,250.00; $808,396.00 <br /> $892,351.89 <br /> TOTAL TASK COST $81,517 $2,439 $14,664 $2,482 $791,250 <br /> TOTAL TASK COST-MULTIPLE EQUIPMENT <br /> Golder Associates Inc. 983-2460 <br /> 2/5/99 FRED R.BANTA,INC. 73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.