My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-02-05_HYDROLOGY - M1977493
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977493
>
1999-02-05_HYDROLOGY - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 4:27:50 PM
Creation date
11/1/2011 7:29:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
HYDROLOGY
Doc Date
2/5/1999
Doc Name
Water Treatment Facility Area
From
Climax
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLIMAX MINE FINANCIAL WARRA WCLAMATION COST ESTIMATE <br /> 4.14 MISCELLANEOUS ROADS <br /> PLAN SURFACE DISTURBANCE (ACRES) = N/A <br /> R P%"- 1, M <br /> M%--n <br /> TASKS: <br /> Backfill 1000'of road south of Ceresco Ridge. <br /> Reduce road from McNulty Dump to Bartlett Mountain. <br /> Grade 12 acres of road segment up Bartlett Mountain. <br /> Rip roads at base of No. I Dam and Oxide Pond area. <br /> Rip 6 acres of road between No.3 Dam and Mayflower Road. <br /> Grade and rip 4 acres of roads southeast and northeast Dam#5. <br /> Grade and rip 2 acres of roads northwest of Mayflower Pond. <br /> Ri 7 Grade Ri TOTAL <br /> Backfill Reduce I Grade Rip RipW Grade& COSTS <br /> Road -"! 1 1 12 Acre Roa 6 Acre 4 Acres 2 Acreo Roady, re'r, <br /> Equipment D9N 330 330 D7H D7H D7H D7H <br /> Dozer Excavator Excavator Dozer Dozer Dozer Dozer <br /> Time Required(hours) 69.76 176.614; 167.46 16.09 27.58: 155.72 1 77.89 ------ <br /> Area Reclaimed(acres) ------ ---- ----- ------ ------ ------ L ------ <br /> Unit Cost <br /> Equipment($/hour) 783 <br /> si7 <br /> :$69-` 0 b <br /> 1h KNI 1,,4,2 i ------ <br /> j-, <br /> $23.4-2 2330 <br /> $2312 <br /> $Labor($/hour) <br /> Other Cost ------ ------ <br /> -,- �8,896.49' $12,152.83, $11,521.25; $1,259.85' �S-2;1-59.5 1, $12,336.14 $6,170.45 $54,496.52 <br /> Subtotal Equipment Cost I <br /> Subtotal Labor Cost $1,612-.85 ! $4,115.71 $3,901.82 $372.00 $637.65; $3,600.25 $1,800.82 $16,041.09 <br /> I <br /> Subtotal Other Cost ------- ---- ----- ------ t ------ ------ $0.00 <br /> $70,537.61 <br /> TOTAL TASK COST $10,509 I $16,269 1 $15,423 $1,632 $2,797 $15,936 $7,971 <br /> TOTAL TASK COST-MULTIPLE EQUIPMENT <br /> .......... ... ..... <br /> Golder Associates Inc. 983-2460 <br /> 2/5/99 FRIED R.BANTA,INC. 72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.