My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-02-05_HYDROLOGY - M1977493
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977493
>
1999-02-05_HYDROLOGY - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 4:27:50 PM
Creation date
11/1/2011 7:29:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
HYDROLOGY
Doc Date
2/5/1999
Doc Name
Water Treatment Facility Area
From
Climax
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLIMAX MINE FINANCIAL WAR RECLAMATION COST ESTIMATE <br /> 4.12 EAGLE VALLEY BORROW AREAS. <br /> PLAN SURFACE DISTURBANCE(ACRES)= N/A <br /> x <br /> a <br /> TASKS: <br /> Grade area C7. <br /> Grade area C8. <br /> Grade area C9. <br /> Grade area C 10. <br /> Grade area C11. <br /> Grade area C 12. <br /> Grade area C 13. <br /> Grade area C 14. <br /> �J <br /> ( ' Grade Grade Grade Gradv i GradB' ; Grade G��' ' Grade q� Grade ? i TOTAL COSTS <br /> Area C7 Area C8 ! Area C9"', ; Area C10 Area Cl I i Area C 12 Area C 13 Area C 14 <br /> Equipment ! D7H D7H D7H D7H i D7H D7H D9N D7H <br /> Dozer Dozer Dozer Dozer i Dozer Dozer Dozer Dozer <br /> 9 �� - 6C18330 , <br /> 24.82Area Reclaimed acresTime Re ulred hours 37.24 8.52 12.25 8.52 4.26 160.7 � <br /> I <br /> i <br /> Unit Cost <br /> Equipment($/hour) $78 30 $78 30 I $78 30 �$78 3D $78n30 $?8 30 t $12753 $78 30 <br /> s <br /> LabOther($/hour) $23 121 $23 12 $23 12 $23 12 $23 12 $23 12 $23=1 , �.$23 12a <br /> Subtotal Equipment Cost $2,915.89 $667.12 $959.18 $667.12 I $333.56, $12,587.51 371i 28' $1,943.41 $43,450.02 <br /> Subtotal Labor Cost $860.99 $196.98 i $283.22 $196.98 $98.49� $3,716.77 $4,237.90 $573.84 $10,165.17 <br /> Subtotal Other Cost ----7- --- ------ ----- ----- <br /> ___ $0.00 <br /> �i � i i I i $53,615.19 <br /> TOTAL TASK COST $3,777 , i $864 $1,242 j $864 ' $432 ' $16,304 $27,614 � $2,517IJ <br /> 1-11 <br /> TOTAL TASK COST-MULTIPLE EQUIPMENT <br /> Golder Associates Inc. 983-2460 <br /> ''i 2/5/99 FRED R.BANTA,INC. 70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.