Laserfiche WebLink
CLIMAX MINE FINANCIAL WARRARECLAMATION COST ESTIMATE <br /> 4.10 WATER TREATMENT FACILITY AREA <br /> PLAN SURFACE DISTURBANCE (ACRES) = 5 <br /> W. <br /> `'�� ; "h �,. C a .•,? \- ?.rt � _J• �z c��£ \\ _ - .: yam\ ,y� .7'� ' <br /> 111101 ME <br /> TASKS: <br /> Grade'water treatment facility. <br /> Topsoil water treatment facility. <br /> Grade Topsoil Water Treatment Facility 06179 <br /> TOTAL COSTS <br /> C19 1 <br /> Equipment ` D8N 769C 988B D8N ' t <br /> Dozer Haul Truck Loader Dozer <br /> Time Required(hours) i 162.241 I 14.57 7.29 7.29 i ------ <br /> Area Reclaimed(acres) I ----- ----- ------ ---- ------ <br /> i <br /> Unit Cost <br /> I i <br /> E m (ent $/hour 99.11 .ate $231 98 . � wz ..$23 1 ------ <br /> �� <br /> qP ( ) <br /> Labor $/hour $23 I2 i ------ <br /> ---- 411 a d(0,S:' ------ <br /> Other Cost ( -- ------ <br /> Subtotal Equipment Cost I $16,086.10; $1,2T.25 <br /> $659.23 $361.44 j $18,345.07 <br /> Subtotal Labor Cost $3,750.99 i $3 $161.98 $168:54 $4,401.77 J <br /> Subtotal Other Cost --- -� ------ ----=- ', $0.00 <br /> $22,746.84 <br /> TOTAL TASK COST $19,837 $1,559 $821 $530 <br /> TOTAL TASK COST-MULTIPLE EQUIPMENT it, L $2,910 <br /> 4,2Rq- <br /> Golder Associates Inc. 983-2460 <br /> 2/5/99 FRED R.BANTA,INC. 68 <br />