Laserfiche WebLink
CLIMAX MINE FINANCIAL WARRECLAMATION COST ESTIMATE <br /> 5.1 TASK 4 - DEMOLITION <br /> Projected Climax <br /> Unit Costs Estimated/ <br /> Bldg.# Facility Designation Dimensions Material Volume/Size (2 Actual Cost <br /> 72 POND SHOP -SUPERSTRUCTURE 601 X 40'W X 20'H STEEL 48000 CU.FT. 0.13 $ 6,240 <br /> " -FLOOR(8"T w/wire mesh) 60'L X 40'W CONCRETE 2400 SQ.FT. <br /> " -FOOTING(1.57 X 2.0'W) 60'+60'+40'+40' CONCRETE 200 LIN.FT. <br /> 73 POND SHOP DOCKS -SUPERSTRUCTURE 200'L X 20'W X TH WOOD 12000 CU.FT. 0.13 $ 1,560 <br /> v/74 COHEREX FILL STATION-SUPERSTRUCTURE 221 X 40'W X 10'H STEEL 8800 CUTT. 0.13 $ 1,144 <br /> " -FLOOR(8"T plain) 221 X 40'W CONCRETE 880 SQ.FT. <br /> " -FOOTING(1.57 X 2.0'W) 22'+22'+40'+40' CONCRETE 124 LIN.FT. <br /> TOTAL THIS SPREADSHEET 5.1 = $ 3,431,289 <br /> TOTAL FROM SPREADSHEET 5.2 = $ 1,671,015 <br /> GRAND TOTAL DEMOLITION COSTS = $ 5,102,303 <br /> Golder Associates Inc. 983-2460 <br /> 2/5/99 FRED R.BANTA,INC. 83 <br />