My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-02-05_HYDROLOGY - M1977493
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977493
>
1999-02-05_HYDROLOGY - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 4:27:50 PM
Creation date
11/1/2011 7:29:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
HYDROLOGY
Doc Date
2/5/1999
Doc Name
Water Treatment Facility Area
From
Climax
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 CLIMAX MINE FINANCIAL WARRARECLAMATION COST ESTIMATE <br /> 5.1 TASK 4 -DEMOLITION <br /> Projected Climax <br /> Unit Costs Estimated/ <br /> Bldg.# Facility Designation Dimensions Material Volume/Size Actual Cost <br /> 63 OPEN PIT OFFICES -SUPERSTRUCTURE 40'L X 80'W X 25'H BLOCK 80000 CU.FT. 0.13 $ 10,400 <br /> " -FLOOR(8"T w/wire mesh) 40'L X 80'W CONCRETE 3200 SQ.FT. <br /> " -FOOTING(1.57 X 2.0'W) 40'+40'+80'+80' CONCRETE 240 LINYT. <br /> 64 OPEN PIT PHASE 2 SHP-SUPERSTRUCTURE 440'L X 80'W X 70'H STEEL 2464000 CU.FT. 0.13 $ 320,320 <br /> FLOOR(12"T w/rebar) 440'L X 80'W CONCRETE 35200 SQ.FT. <br /> FOOTING(2.0'T X 3.0'W) 440'+440'+80'+80' CONCRETE 1040 LINYT. <br /> 65 OPEN PIT WASH BAY -SUPERSTRUCTURE 901 X 105'W X 60'H STEEL 67000 CU.FT. 0.13 $ 73,710 <br /> " -FLOOR(12"T w/rebar) 90'L X 105'W CONCRETE 9450 SQ.FT. <br /> " -FOOTING(2.07 X 3.0'W) 90'+90'+105'+105' CONCRETE 390 LINYT. <br /> 6 CAVR ASBESTOS FLT HS-SUPERSTRUCTURE 301 X 30'W X ITH STEEL 10800 CU.FT. 0.13 $ 1,404 <br /> FLOOR(8"T w/wire mesh) 301 X 30'W CONCRETE 900 SQ.FT. <br /> FOOTING(1.5'T X 2.0'W) 30'+30'+30'+30' CONCRETE 120,LI-N-FT. <br /> ASBESTOS REMOVAL NA ASBESTOS 1 ESTIMAT_ $ 3(aU <br /> 67 TENMILE TUNNEL SHOP-SUPERSTRUCTURE 34'L X 26'W X 16'14 TIN 14144 CU.FT. 0.13 $ 1,839 <br /> " -FLOOR(8"T plain) 341 X 26'W CONCRETE 884 SQ.FT <br /> -FOOTING(1.57 X 2.0'W) 34'+34'+26'+26' CONCRETE 120 LINYT. <br /> i <br /> ✓68 TENMILE TUNL OFC-SUPERSTR.(trailer) 50'L X 20'W X ITH STEEL 12000 CU.FT. 0.13 $ 1,560 <br /> V69 TENMILE TUNL CMP HSE-SUPERSTRUCTURE 18'L X 18'W X ITH STEEL 3888 CU.FT. 0.13 $ 505 <br /> FLOOR(8"T w/wire mesh) 18'L X 18'W CONCRETE 324 SQ.FT. <br /> FOOTING(1.57 X 2.0'W) 18'+18'+18'+18' CONCRETE 72 LINYT. <br /> 70 TENMILE TUNL DMP HSE-SUPERSTRUCTURE 40'L X 12'W X 10'H STEEL 4800 CU.FT. 0.13 $ 624 <br /> " " " "-FLOOR(8"T w/wire mesh) 40'L X 12'W CONCRETE 480 SQ.FT. <br /> FOOTING(1.57 X 2.0'W) 40'+40'+12'+12' CONCRETE 104 LIN.FT. <br /> 71 ITENMILE BARGE -SUPERSTRUCTURE 36'L X 36'W X 10'H TIN 12960 CU.FT. 1 0.13 $ 1,685 <br /> Golder Associates Inc. 983-2460 <br /> 2/5/99 FRED R.BANTA,INC. 82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.