Laserfiche WebLink
Demol Cost Comparisons for Climax Bond Recalculation <br />Page 6 Msana Projected Climax <br />racility Designation Dimenaiona Material Volume /vise Meaa'a Katimated Unit Costs rstimated/ <br />Unit -a coat .LLL Actual Cost <br />PRECON - SUPERSTRUCTURE 82'L X 82'W X 48'H STEEL 322752 CU.FT 0.18 $ 58,095 0.13 $ 41,958 <br />- FLOOR (10 "T w/r 82'L X 82'W CONCRETE 6724 SQ.FT 4.73 $ 31,805 <br />- FOOTING (1.5'T 82' +82' +82' +82' CONCRETE 328 LIN.F 10.45 $ 3,428 <br />" - ASBESTOS REMOVA NA ASBESTOS 1 ESTIM 29898 $ 29,898 <br />DRYING PLANT - SUPERSTRUCTURE 155'L X 105'W X 30'H STEEL 488250 CU.FT 0.18 $ 87,885 0.13 $ 63,473 <br />" - FLOOR (10 "T w/r 155'L X 105'W CONCRETE 16275 SQ.FT 4.73 $ 76,981 <br />" - FOOTING (1.5'T 155' +155' +105' +105' CONCRETE 520 LIN.F 10.45 $ 5,434 <br />" - ASBESTOS REMOVA NA ASBESTOS 1 ESTIM 405 $ 405 <br />PACKING PLANT - SUPERSTRUCTURE 210'L X 80'W X 30'H STEEL 504000 CU.FT 0.18 $ 90,720 0.13 $ 65,520 <br />- FLOOR (10 "T w/r 210'L X 80'W CONCRETE 16800 SQ.FT 4.73 $ 79,464 <br />NO 1 THICKNER <br />Iff <br />NO 2 THICKNER <br />- FOOTING (1.5'T 210' +210' +80' +80' CONCRETE 580 LIN.F 10.45 $ 6,061 <br />- SUPERSTRUCTURE 111'L X 111'W X 10'H STEEL 123210 CU.FT 0.18 $ 22,178 <br />- FLOOR (8 "T plat 111'L X 111'W CONCRETE 12321 SQ.FT 3.16 $ 38,934 <br />- FOOTING (1.0'T 111' +111' +111' +111' CONCRETE 444 LIN.F 7.91 $ 3,512 <br />- SUPERSTRUCTURE 111'L X 111'W X 10'H STEEL 123210 CU.FT 0.18 $ 22,178 <br />- FLOOR (8 "T plai 111'L X 111'W CONCRETE 12321 SQ.FT 3.16 $ 38,934 <br />- FOOTING (1.0'T 111' +111' +111' +111' CONCRETE 444 LIN.F 7.91 $ 3,512 <br />PRECON THICKNER - SUPERSTRUCTURE 155'L X 155'W X 12'H STEEL 288300 CU.FT 0.18 $ 51,894 Demolished $ <br />" " - FLOOR. (8 "T plai 155'L X 155'W CONCRETE 24025 SQ.FT 3.16 $ 75,919 1998 <br />" - FOOTING (1.0'T 155' +155' +155' +155' CONCRETE 620 LIN.F 7.91 $ 4,904 <br />" " - ASBESTOS REMOVA NA ASBESTOS 1 ESTIM 1374 $ 1,374 <br />PRECON WATER TANK - SUPERSTRUCTURE 37'L X 37'W X 20'H STEEL 27380 CU.FT 0.18 $ 4,928 Demolished $ <br />" • - FLOOR (8 "T plai 37'L X 37'W CONCRETE 1369 SQ.FT 3.16 $ 4,326 1998 <br />- FOOTING (1.0'T 37' +37' +37' +37' CONCRETE 148 LIN.F 7.91 $ 1,171 <br />3 MILL BUILDING - SUPERSTRUCTURE 725'L X 180'W X 80'H STEEL 10440000 CU.FT 0.18 $ 1,879,200 0.13 $ 1,357,200 <br />" ff It - FLOOR (12 "T w/r 725'L X 180'W CONCRETE 130500 SQ.FT 5.52 $ 720,360 <br />" " - FOOTING (2.0'T 725' +725' +180' +180' CONCRETE 1810 LIN.F 16.26 $ 29,431 <br />" " - HIGH CONCRETE ASSUME 12 "TX36315 SQFT CONCRETE 36315 SQ.FT 11.3 $ 410,360 <br />Note: This table was developed using data from DMG's Worksheet M493 -4 + actual Cyprus Amax project costs. 10 -9-97 <br />• • <br />16,017 <br />16,017 <br />