My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-02-05_GENERAL DOCUMENTS - M1977493 (7)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977493
>
1999-02-05_GENERAL DOCUMENTS - M1977493 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 4:27:51 PM
Creation date
11/1/2011 7:29:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/5/1999
Doc Name
The Nature and Properties of Soils, 8th Edition
From
Climax
To
DMG
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demol • Cost Comparisons for Climax Bond Recalculation <br />• • <br />Page 5 Minima projected Climax <br />facility Designation Dimenaiona Material Volume /Size Maul& Intimated Unit Costa Intimated/ <br />itait S Coat ,($y Actual Coat <br />DOMESTIC WATER PLNT - SUPERSTRUCTURE 45'L X 81'W X 24'H STEEL 87480 CU.FT 0.18 $ 15,746 0.13 $ 11,372 <br />" " " - FLOOR (8 "T w /re 45'L X 81'W CONCRETE 3645 SQ.FT 3.94 $ 14,361 <br />" - FOOTING (1.0'T 45' +45' +81' +81' CONCRETE 252 LIN.F 8.7 $ 2,192 <br />2 MILL GAL TANK #2 - SUPERSTRUCTURE 90'L X 90'W X 41'H STEEL 332100 CU.FT 0.18 $ 59,778 0.13 $ 43,173 <br />" - FLOOR (10 "T pia 90'L X 90'W CONCRETE 8100 SQ.FT 3.8 $ 30,780 <br />" " - FOOTING (1.5'T 90' +90' +90' +90' CONCRETE 360 LIN.F 9.5 $ 3,420 <br />2 MILL GAL TANK #1 - SUPERSTRUCTURE 90'L X 90'W X 41'H STEEL 332100 CU.FT 0.18 $ 59,778 0.13 $ 43,173 <br />" - FLOOR (10 "T pla 90'L X 90'W CONCRETE 8100 SQ.FT 3.8 $ 30,780 <br />" " - FOOTING (1.5'T 90' +90' +90' +90' CONCRETE 360 LIN.F 9.5 $ 3,420 <br />NEW GAS STORAGE TANK- SUPERSTRUCTURE 5O'L X 34'W X 5'H CONCRETE 8500 CU.FT 0.23 $ 1,955 0.13 $ 1,105 <br />" " " - FLOOR (8 "T w /wi 50'L X 34'W CONCRETE 1700 SQ.FT 3.55 $ 6,035 <br />" ^ " - FOOTING (1.5'T 50' +50' +34' +34' CONCRETE 168 LIN.F 10.45 $ 1,756 <br />NO 2 CRUSHER - SUPERSTRUCTURE 25O'L X 82'W X 80'H STEEL 1640000 CU.FT 0.18 $ 295,200 0.13 $ 213,200 <br />" " - FLOOR (12 "T w/r 25O'L X 82'W CONCRETE 20500 SQ.FT 5.52 $ 113,160 <br />" " " - FOOTING (2.0'T 250' +250' +82' +82' CONCRETE 664 LIN.F 16.26 $ 10,797 <br />^ " ^ - ASBESTOS REMOVA NA ASBESTOS 1 ESTIM 3293 $ 3,293 <br />OLD MILL CONTROL - SUPERSTRUCTURE 72'L X 32'W X. 20'H BLOCK 44640 CU.FT 0.18 $ 8,035 Demolished $ <br />- FLOOR (8 "T w /wi 72'L X 32'W CONCRETE 2232 SQ.FT 3.55 $ 7,924 and <br />" ^ - FOOTING (1.5'T 72' +72' +32' +32' CONCRETE 208 LIN.F 10.45 $ 2,174 Reclaimed <br />OLD MILL DRY - SUPERSTRUCTURE 9O'L X 56'W X 12'H BLOCK 60480 CU.FT 0.18 $ 10,886 Demolished $ <br />- FLOOR (8 "T w /wi 9O'L X 56'W CONCRETE 5040 SQ.FT 3.55 $ 17,892 and <br />- FOOTING (1.5'T 90' +90' +56' +56' CONCRETE 292 LIN.F 10.45 $ 3,051 Reclaimed <br />OLD ASSAY LAB - SUPERSTRUCTURE 57'L X 31'W X 10'H BLOCK 17670 CU.FT 0.18 $ 3,181 Demolished $ <br />- FLOOR (8 "T w /wi 57'L X 31'W CONCRETE 1767 SQ.FT 3.55 $ 6,273 1998 <br />- FOOTING (1.5'T 57' +57' +31' +31' CONCRETE 176 LIN.F 10.45 $ 1,839 <br />Note: This table was developed using data from DMG's Worksheet M493 -4 + actual Cyprus Amax project costs. 10 -9 -97 <br />2 CRUSHER SWTCH HSE- SUPERSTRUCTURE 86'L X 32'W X 18'H STEEL 49536 CU.FT 0.18 $ 8,916 0.13 $ 6,440 <br />" ^ " " - FLOOR (8 "T w /re 86'L X 32'W CONCRETE 2752 SQ.FT 3.94 $ 10,843 <br />" " " - FOOTING (1.5'T 86' +86' +32' +32' CONCRETE 236 LIN.F 10.45 $ 2,466 <br />
The URL can be used to link to this page
Your browser does not support the video tag.