Laserfiche WebLink
• regraded, if necessary. They will be revegetated in accordance with the revegetation plan <br />set forth later in this section. <br />• <br />The facilities found on the surface, including the shop, office and warehouse buildings, <br />were completely removed following mining activities. Concrete foundations were buried <br />on site as shown on Map 12. Materials resulting from this removal were either sold to a <br />local scrap dealer or hauled from the permit area to a suitable dump site. The areas were <br />then be regraded and revegetated. The access road from the surface facility to the portal <br />area will be revegetated at the conclusion of mining activities. The main haul /access road <br />and bridge that provide access to the property will be left at the conclusion of the mining <br />as shown on the Existing And Final Contours and Sections Map (Map 12). By letter dated <br />January 31, 2011, Mountain Coal Company advised Bear that it had no issues with the <br />retention of the bridge. The letter is located in Exhibit 12. The access road or other roads <br />no longer needed for operations, reclamation, or environmental monitoring, will be <br />restored. Roadbeds will be rounded and shaped to conform with the adjacent terrain and <br />to meet natural drainage restoration standards. At the completion of this regrading, <br />topsoil will be applied and revegetation will commence. <br />Topsoil Structures. Stockpiled topsoil used for reclamation purposes will not be moved <br />until required for redistribution on a graded area. The topsoil will be redistributed so as to <br />achieve an approximate uniform and stable thickness and to minimize compaction. At the <br />cessation of mining operations, all topsoil will be removed from the stockpile and <br />redistributed prior to revegetation. <br />The detailed plans for initial removal, storage and subsequent redistribution of topsoil <br />used for reclamation purposes are discussed later in this Section and also in Section <br />2.05.3. <br />MR -33 2.05 -32 03/14/11 <br />i9fPRoVF,,)/ <br />