Laserfiche WebLink
Pagel of 2 <br />BULLDOZER WORK <br />Task description: Replace Topsoil from Stockpile to Light -Use Roads <br />Site: Bowie No. 2 Mine Permit Action: Minor Revision 127 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 285 State: <br />Date: 13- Jun -11 County: <br />User: JRS <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9R - 9SU (2005) <br />Horsepower: 405 <br />Blade Type: Semi - Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C083 -285 <br />Total unit Cost/Hour: $198.57 <br />Total Fleet Cost/Hour: $198.57 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,100 <br />Swell factor: 1.125 <br />Loose volume: 2,363 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />150 feet <br />910.5 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 5 % <br />Average site altitude: 7,500 feet <br />Material weight: 2,550 lbs /LCY <br />Weight description: Earth - Dry packed <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$49.19 <br />NA <br />Operating Cost/Hour: <br />$110.89 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $198.57 <br />Total Fleet Cost/Hour: $198.57 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,100 <br />Swell factor: 1.125 <br />Loose volume: 2,363 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />150 feet <br />910.5 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 5 % <br />Average site altitude: 7,500 feet <br />Material weight: 2,550 lbs /LCY <br />Weight description: Earth - Dry packed <br />CIRCES Cost Estimating Software <br />