Laserfiche WebLink
Bulldozer Worksheet Cont'd <br />Task # 285 <br />Job Condition Correction Factor <br />Operator Skill: <br />0.750 <br />Material consistency: <br />1.000 <br />Dozing method: <br />1.000 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />0.903 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.902 <br />Blade type: <br />1.000 <br />Net correction: 0.4056 <br />Adjusted unit production: 369.30 LCY /hr <br />Adjusted fleet production: 369.3 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.538/LCY <br />Total job time: 6.40 Hours <br />Total job cost: $1,270.29 <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />(AVG.) <br />SHIFT/DAY) <br />(FND-RF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />