My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-04-26_PERMIT FILE - M1999051 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1999051
>
1999-04-26_PERMIT FILE - M1999051 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2021 1:48:50 PM
Creation date
10/24/2011 1:57:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999051
IBM Index Class Name
PERMIT FILE
Doc Date
4/26/1999
Doc Name
112 Reclamation Permit Application part 2
From
AmerAlia, Inc.
To
DRMS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L <br /> RECLAMATION COSTS <br /> All roads, ponds, plant facilities, well pads, and other facilities described in Exhibit D - Mining Plan <br /> will of course be reclaimed as described in Exhibit E - Reclamation Plan. The following inventories <br /> assume that the full potential of six production wells and resultant well pads are installed. <br /> L-1 ESTIMATED EARTHWORK QUANTITIES <br /> Access Road <br /> Unclassified Excavation: 60,000c.y. <br /> Rock Excavation: 20,000c.y. <br /> Embankment: 70,000c.y. <br /> Process and Evaporation Ponds <br /> Unclassified Excavation: 43,000c.y. <br /> Rock Excavation: 18,000c.y. <br /> Embankment: 54,000c.y. <br /> Water Storage Pond <br /> Unclassified Excavation: 20,000c.y. <br /> Rock Excavation: 10,000c.y. <br /> Embankment: 26,000c.y. <br /> Process Plant Site <br /> Unclassified Excavation: 10,000c.y. <br /> Rock Excavation: 20,000c.y. <br /> Embankment: 26,000c.y. <br /> Well Field <br /> Unclassified Excavation: 6,500c.y. <br /> Total estimated earthwork quantities are: <br /> Unclassified Excavation: 139,500 <br /> Rock Excavation: 68,000 <br /> Embankment: 176,000 <br /> L-2 CONCRETE <br /> Approximately 2,100 c.y. of concrete will be used in the project; 1,800 c.y. in the plant floor and <br /> foundations, and 300 c.y. in footing. - <br /> L-3 TOPSOIL <br /> As described in Exhibit E, topsoil will be salvaged and handled in a manner that maximizes <br /> recovery of suitable resources for soil reconstruction and minimizes handling. Where suitable soil is <br /> G:1LMV,78545.002\Reclamation%Reclamexh.DOC I-'1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.