Laserfiche WebLink
EXHIBIT L <br /> RECLAMATION COSTS <br /> All roads, ponds, plant facilities, well pads, and other facilities described in Exhibit D - Mining Plan <br /> will of course be reclaimed as described in Exhibit E - Reclamation Plan. The following inventories <br /> assume that the full potential of six production wells and resultant well pads are installed. <br /> L-1 ESTIMATED EARTHWORK QUANTITIES <br /> Access Road <br /> Unclassified Excavation: 60,000c.y. <br /> Rock Excavation: 20,000c.y. <br /> Embankment: 70,000c.y. <br /> Process and Evaporation Ponds <br /> Unclassified Excavation: 43,000c.y. <br /> Rock Excavation: 18,000c.y. <br /> Embankment: 54,000c.y. <br /> Water Storage Pond <br /> Unclassified Excavation: 20,000c.y. <br /> Rock Excavation: 10,000c.y. <br /> Embankment: 26,000c.y. <br /> Process Plant Site <br /> Unclassified Excavation: 10,000c.y. <br /> Rock Excavation: 20,000c.y. <br /> Embankment: 26,000c.y. <br /> Well Field <br /> Unclassified Excavation: 6,500c.y. <br /> Total estimated earthwork quantities are: <br /> Unclassified Excavation: 139,500 <br /> Rock Excavation: 68,000 <br /> Embankment: 176,000 <br /> L-2 CONCRETE <br /> Approximately 2,100 c.y. of concrete will be used in the project; 1,800 c.y. in the plant floor and <br /> foundations, and 300 c.y. in footing. - <br /> L-3 TOPSOIL <br /> As described in Exhibit E, topsoil will be salvaged and handled in a manner that maximizes <br /> recovery of suitable resources for soil reconstruction and minimizes handling. Where suitable soil is <br /> G:1LMV,78545.002\Reclamation%Reclamexh.DOC I-'1 <br />