Laserfiche WebLink
e <br /> sheet 1 of 2 <br /> Colorado Division of Minerals and Geology <br /> ----------------------------------------- <br /> ESTIMATING FORM - STRUCTURAL DEMOLITION WORK <br /> Task No.: 2 Prepared by ACS <br /> Permit No.: M-99-051 Filename M051-2 <br /> Date ' n ° -7 7 Operation Rock School Lease Project <br /> ------------------ -------------------------------- <br /> Permitting action New aplication <br /> ------------------------------------------------------------------------------------------------------- <br /> Task description Demolish and remove surface facilities <br /> ------------------------------------------------------------------------------------------------------- <br /> MEANS Location Adjustment: 107.206 of base unit costs - MEANS SITE WORK & LANDSCAPE COST DATA 1997 Edition <br /> ------------------ <br /> I 1 I I MEANS BASEI ADJUSTED <br /> STRUCTURE / FACILITY / EQUIPMENT DESCRIPTION DIMENSIONS I COMPOSITION I QUANTITY I UNIT I UNIT COST I TOTAL COST <br /> I I I I I I <br /> Process Building superstructure I 25,000 sq.ft. x 135' I mixed 13,375,000 1 cu.ft. 1 $0.18 I $651,240 <br /> I I I I I I <br /> Administration Building superstructure I 50'L x 30'W x 161H I mixed I 24,000 I cu.ft. 1 $0.18 1 $4,631 <br /> I I I I I I <br /> Substation superstructure I 30'L x 301W x 101H I mixed I 9,000 I cu.ft. I $0.18 I $1,737 <br /> I I I I I I <br /> Pump House superstructure I 30'L x 30'W x 181H 1 mixed I 16,200 I cu.ft. I $0.18 I $3,126 <br /> I I I I I I <br /> Raw water tank I 60' dia. x 481H 1 steel I 135,696 I cu.ft. I $0.18 I $26,184 <br /> I I I I I I <br /> Cooling Tower I 30'L x 201W x 481H 1 mixed I 28,800 I cu.ft. I $0.18 1 $5,557 <br /> I I I I I t <br /> Concrete floor, all structures I 12" reinforced I concrete I 31,727 I sq.ft. I $5.52 I $187,743 <br /> I I I I I I <br /> Concrete footings, equipment pedestals, etc. I 300 c.y. footings, I concrete 1 926 ( cu.yd. I $81.00 I $80,415 <br /> I 626.1 c.y. other l I I I 1 <br /> I I I I I I <br /> Remove well field piping I 8-12" pipe, 504011, I steel I 5,040 1 lin.ft.1 $8.45 I $45,654 <br /> I I I 1 1 1 <br /> Remove well field piping 1 4" pipe, 342011, 1 steel 1 3,420 1 lin.ft.1 $5.05 1 $18,515 <br /> I I I I I I <br /> Dispose of well field piping (see notes) 1 see notes I steel I 1*1 lumpsuml **********1 $15,322 <br /> I I I I I I <br /> Remove and scrap pipe racks (see notes) I see notes I steel 1 1 1 lumpsuml **********I $46,292 <br /> I I I I I I <br /> Remove pipe rack footings I 1' dia. x 3' I concrete I 90 I cu.yd. I $81.00 1 $7,815 <br /> I I I I I I <br /> Above ground transmission line I 29,600 linear feet 1 power line I 29,600 1 lin.ft.1 $1.95 1 $61,876 <br /> I I I I I I <br /> Demolish and remove asphalt from access road I 1.4 mi. x 32' x 4" 1 asphalt I 26,283 I sq.yd I $4.61 I $129,888 <br /> I I I I I I <br /> Remove fence around facilities area & ponds I n/a I 8' mesh I 4,020 1 lin.ft. 1 $1.70 I $7,326 <br /> I I I I I I <br /> Cut & fold in liners, double lined ponds I 11 acres I HDPE liner I 11 I acre I $4,000.00 I $47,168 <br /> I I I I I I <br /> Cut & fold in liner, water storage pond I 10 acres I HDPE.liner I 10 I acre I $2,000.00 I $21,440 <br /> I I I I I I <br /> TASK SUBTOTAL - sheet 1 $1,361,929 <br />