My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-07-07_GENERAL DOCUMENTS - M1999051
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1999051
>
1999-07-07_GENERAL DOCUMENTS - M1999051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2021 7:08:32 AM
Creation date
10/24/2011 1:36:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999051
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
7/7/1999
Doc Name
Reclamation costs
From
DRMS
To
AmerAlia, Inc.
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT: sheet 2- of 2 <br /> ------------------ Total Eqp. Fleet Size Haul Trip Return Trip <br /> Machine Description Cost/hr (no. hauled) Cost/hr Cost/hr <br /> ----------------------------------------------------------- <br /> Drill rig $127.74 1 $127.74 $127.74 <br /> 2500 gal. water truck $37.03 1 $37.03 $37.03 <br /> Flat bed truck $35.00 1 $35.00 $35.00 <br /> Subtotals $199.77 $199.77 <br /> MOB/DEMOB SUPPORT EQUIPMENT: --------` -`------- <br /> --- ----------------------- Weight Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br /> Non-Roadable Eqp. Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cost/hr Cost/ea <br /> Subtotals $0.00 $0.00 $0.00 <br /> --------- --------- --------- <br /> Total Eqp. Fleet Size Haul Trip Return Trip <br /> Roadable Eqp. Description Cost/hr (no. hauled) Cost/hr Cost/hr <br /> Subtotals $0.00 $0.00 <br /> --------- --------- <br /> EQUIPMENT HAUL DISTANCE & TIME <br /> ------------------------------ <br /> ------------------------------ <br /> Nearest major city or town within project area region: Grand Junction <br /> -------------------------------------------------------- <br /> Total one way travel distance = 104.0 miles. Average travel speed = 40.00 mph. <br /> ------ ------------- <br /> Job Time - Non Roadable Equip.= 0.50 hours load Roadable Equip.= N/A hours load <br /> 2.60 hours haul 2.60 hours haul <br /> 0.50 hours unload N/A hours unload <br /> 2.60 hours return 2.60 hours return <br /> ----------------- ---------------------- <br /> JOB COST `Total Mob/Demob Cost = $8,712.43 <br /> NOTE: Non-roadable equipment (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br /> consisting of a one-way loaded haul and a one-way empty return. Roadable equipment (no haul rig required) <br /> costs based on one round trip. Colorado DOT requires special permits for oversize equipment on certain <br /> specified road segments within the State. Separate permits are required for each rig on each loaded trip. <br /> Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br /> equipment hauling, and loading/unloading times must be increased substantially for equipment which must be <br /> partially dismantled for transport and re-assembled at the job site. Costs for lifting equipment and other <br /> support equipment needed for this work should be included in the mob/demob costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.