Laserfiche WebLink
• <br />RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL /SHAFT SEALING <br />Task No. <br />Task Description <br />L. DRILL HOLE /MONITORING WELL SEALING <br />Task No.I Task Description <br />1 <br />3 1 Seal and abandon production wells <br />4 1 Seal and abandon deep water well <br />5 1 Seal and abandon alluvial water wells <br />6 I Seal and abandon monitoring wells <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No. Task Description <br />2 Demolition <br />16, 17 Seeding <br />Fencing <br />1 Mob /Demob <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD & PROFIT <br />Item No.I Item Description <br />1 <br />1.. 1 Public Liability Insurance 1.550% of dir. <br />2. 1 Contractor's Performance Bond 1.550% of dir. <br />3. 1 Contractor's Profit 10.00% of dir. <br />4. 1 Job Superintendent.. <br />NET INDIRECT COST PERCENTAGE: <br />Subtotal (K): <br />Cost ($) <br />Cost ($) <br />$97,653 <br />$4,026 <br />$1,917 <br />$21,430 <br />Subtotal (L): $125,026 <br />Cost ($) <br />$1,631,015 <br />$157,592 <br />$8,712 <br />Subtotal (M): $1,797,319 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): $2,158,290 <br />Cost ($) <br />$33,453 <br />$33,453 <br />$215,829 <br />Subtotal (A): $282,736 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 & P): $2,441,026 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.1 Item Description 1 Cost ($) <br />1 1 <br />1. 1 Minerals Program Adm • 5.00% of cntr.l $122,051 <br />18.765 Subtotal (B): $122,051 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): $404,787 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): $2,563,077 <br />