Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No. <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION /REMOVAL <br />Task No. <br />18 <br />19 <br />20 <br />13 <br />14 <br />15 <br />• • <br />Evaporate pond water <br />Sample monitoring wells <br />Task Description <br />Task Description <br />J. EARTHWORK - TOPSOIL /SUBSOIL REPLACEMENT <br />Task No. Task Description <br />Replace topsoil in process plant area <br />Subtotal (H): <br />Subtotal (I): <br />Replace topsoil on evap. and storage pond areas <br />Miscellaneous topsoil replacement, 'well field, <br />piping corridor, well field road, etc. <br />Cost ($) <br />Cost ($) <br />$77,759 <br />$12,000 <br />$89,759 <br />Cost ($) <br />$11,801 <br />$2,306 <br />$22,170 <br />Subtotal (J): $36,277 <br />