Laserfiche WebLink
The permittee will: <br />• • <br />• Retain a copy of this SWMP at the construction site from the date of project <br />initiation until the date of final stabilization. <br />• Select qualified individuals to conduct site inspections, oversee maintenance and <br />repair activities, maintain stormwater management and inspection records, and <br />complete inspection and maintenance reports. <br />• Minimize the amount of disturbed soil exposed to stormwater at any time. <br />• Maintain all measures and controls so they are effective in erosion and sediment <br />control. <br />• Inspect erosion and sediment controls, disturbed areas of the construction site that <br />have not been finally stabilized, material storage areas exposed to precipitation, <br />construction entrances and exits for off -site vehicle tracking, and discharge points, <br />if any, at least once a week or within 24 hours after a storm event of 0.5 inch or <br />greater. Where site areas have been finally stabilized or in semi -arid regions (10- <br />20 inches of average annual rainfall, which includes the Project Area) monthly <br />inspections must be made. <br />• Take immediate actions to prevent/correct problems where pollutants (i.e. <br />sediments) are observed to be passing structural controls and document the <br />actions taken to rectify the problem. <br />• Post a list in staging areas and in the office identifying the names and phone <br />numbers of personnel responsible for responding to authorized pollutant <br />discharges and spills of toxic or hazardous materials. <br />8 <br />