Laserfiche WebLink
GCC <br />Manager of Coal Services <br />GCC Energy, LLC <br />"Safety as a Value" <br />Telephone: 970.385.4528 <br />Facsimile: 970.385.4638 <br />GCC Energy, LLC <br />6473 County Road 120 <br />Hesperus, CO 81326 <br />Map King II -007H thru Map King II -007K shows the plan and profile of the proposed <br />upper site access roads. The grades vary from 1.27% to 9.85% which complies with <br />Section 4.03.2. Road ditches are provided along the roads to direct runoff to the <br />detention pond. The road along the west diversion ditch is cross sloped away from the <br />ditch to direct runoff the road borrow ditch on the west side of the road. Typical road <br />sections for the upper site access, portal access and belt portal access are shown on <br />Map King II -007L. <br />This technical revision supersedes the upper haul road portion and mine portal access <br />design of the permit as designed by J. T. Paluso, EIS Environmental and Engineering <br />Consulting. <br />Please contact Tom Bird at 970.385.4528 x 6503 with questions or comments. <br />Sincerely, <br />Tom Bird <br />