My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-24_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2011-10-24_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:19 PM
Creation date
10/24/2011 9:48:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
REVISION
Doc Date
10/24/2011
Doc Name
Letter, Application and Public Notice
From
GCC Energy
To
DRMS
Type & Sequence
TR19
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GCC <br />October 20, 2011 <br />Dear Mr. Hernandez: <br />"Safety as a Value" <br />Mr. Dan Hernandez <br />Colorado division of Reclamation, Mining 86 Safety <br />Mined Land Reclamation Division <br />1313 Sherman Street Room 215 <br />Denver, CO 80203 <br />Telephone: 970.385.4528 <br />Facsimile: 970.38 5.4638 <br />Re: GCC Energy, LLC <br />King II Mine <br />CDRMS Permit # C -81 -035 <br />Technical Revision #19 - Upper Site Road Design Revision <br />GCC Energy, LLC <br />6473 County Road 120 <br />Hesperus, CO 81326 <br />This technical revision is being submitted to revise the upper site access road designs <br />for the current use of access to the mine portal, belt portal, warehouse, shop, and <br />water tanks. The road is used by mine vehicles and equipment as well as vehicles <br />delivering materials and for the mine operation. The traffic is light and intermittent <br />with the heaviest traffic being at shift change. <br />The revised section of the upper site access road (see Map King II -007) starts west of <br />the scale house as the haul road turns south toward County Road 120, Station 0 +00. <br />The revised section of the road goes north road approximately 800 feet along the West <br />Clearwater Ditch to the shop where it turns east and curves around the proposed mine <br />office and bathhouse. The access road continues past the warehouse and loops <br />around the proposed mine office and bathhouse parking area to connect back to the <br />road just north of the run -of mine (ROM) stockpile, Station 16 +35.49. The mine portal <br />and belt portal access roads exit off the eastern side of this upper site access loop. <br />This technical revision proposes to reduce the road widths from 30 feet haul road for <br />the upper site access road loop to 14 feet. One way traffic begins above the ROM <br />stockpile with the west side being one way to the shop and mine portal and the east <br />side being one way out. Traffic flow directions are shown on Map King II -007K. The <br />access road widths on the west side of the loop have been narrowed due to the limited <br />area between the western permit boundary and west diversion ditch and the <br />installation of infrastructure on the east side of the loop road that requires protection. <br />This technical revision also proposes to reduce the width of the mine portal access <br />road from 20 feet to 18 feet. This width more closely fits the portal opening and the <br />width is also limited by the installation of the mine fan and other infrastructure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.