Laserfiche WebLink
Permittee/ <br />Person <br />SENECA COAL COMPANY <br />U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />Permit <br />N um ber <br />Field Visit <br />Date <br />)7/19/2011 <br />State Program <br />Continuation Page <br />28. Performance Standard Categories <br />Codes: 1=Compliance. 2=Noncompliance, 3=Not Planned, 4=Not Started, 5=Noncompliance Identified Elsewhere, 6=Previousiv Cited <br />A. Administrative <br />1. Mining within Valid Permit <br />2. Mining within Bonded Area <br />3. Terms & Conditions of Permit <br />4. Liability Insurance <br />5. Ownership and Control <br />6. Temporary Cessation <br />7. AML Rec. Fees -- Non-Respondent <br />8. AML Rec. Fees -- Failure to Pay <br />B. Hydrologic Balance <br />1.1 Drainage Control <br />2. Inspections & Certifications <br />3. 1 Siltation Structures <br />4._ Discharge Structures <br />5. 1 Diversions <br />6. Effluent Limits <br />7._ Ground Water Monitoring <br />8._ Surface Water Monitoring <br />9._ Drainage - Acid-Toxic Materials <br />10. Impoundments <br />11._ Stream Buffer Zones <br />C. Topsoil& Subsoil <br />I._ Removal <br />2._ Substitute Materials <br />3'. Storage and Protection <br />4. 1 Redistribution <br />D. Backfilling & Grading <br />1._ Exposed Openings <br />2._ Contemporaneous Reclamation <br />3. 1 Approximate Original Contour <br />4. 1 Highwall Elimination <br />5. Steep Slopes (includes downslope) <br />6._ Handling of Acid & Toxic Materials <br />7. 1 Stabilization (rills and gullies) <br />E. Excess Spoil Disposal <br />1. 3 Placement <br />2. 3 Drainage Control <br />3. 3 Surface Stabilization <br />4. 3 Inspections & Certifications <br />F. Coal Mine Waste <br />(Refuse Piles/Impoundments) <br />1. 3 Drainage Control <br />2. 3 Surface Stabilization <br />3. Placement <br />4. 3 Inspections and Certifications <br />5. 3 Impounding Structures <br />G. Use Of Explosives <br />1. 3 Blaster Certification <br />2. 3 Distance Prohibitions <br />3. 3 Blast Survey/Schedule <br />4. 3 Warnings & Records <br />5. 3 Control of Adverse Effects <br />H. 3 Subsidence Control Plan <br />I. Roads <br />1. Road Construction <br />2. Certification <br />3. Drainage <br />4. Surfacing and Maintenance <br />5. Reclamation <br />J. Signs & Markers <br />1.1 Signs <br />2. 1 Markers <br />K. _ Distance Prohibitions <br />L. Revegetation <br />I. 1 Vegetative Cover <br />2. 1 Timing <br />M. 1 Postmining Land Use <br />N. Other <br />General <br />Category <br />Performance <br />A 1 1) PH 2 BR <br />2) <br />3) <br />Performance Standard Categories <br />30 CFR Counterparts <br />A. Administrative <br />1. Valid P•mnt -..-!-, <br />, . <br />2. Mining within Banded Area '7311 <br />3. Terms. & Conditiceis of Penult 77317 <br />4. Liability Insurance 800.60 <br />5. Ownership and Control . <br />6. Thnporary Cessation 842.11(e)&816/817.131 <br />7. AML Rec. Fees -Non-ReTonclait S70.15(b) <br />S. AML Rec.. Fees - Failure to Pay S'0.15(a) <br />B. Hydrologic Balance (816,117.41-57) <br />1. 'Drainage Control ---4 <br />2.. InTections & Certifications 49 (a)(10) <br />3. Siltation Structures ----46 <br />4. Discharge Structures 17 <br />5. Diversions -43 <br />6. Effiumt Limits 12 <br />7. Ground Water Monitoring 41(c) <br />8. Surface Water Monitoring 41(e; <br />9. Drainaae -Acid - Toxic Materials 41(f) <br />10. Impoundments • 0 <br />. 11. Stream Buffer Zone: 57 <br />C. Topsoil & Subsoil (316117.22) <br />1. Removal 22(a) <br />2. Sub aitut e Materials. 22(c) <br />3. Storage and Protection 22(c) <br />4. Redistribution 22(d) <br />.Backfilling & Grad.ing 816117.95-107) <br />1. Exposed Openings 816/81713 14,154 823.11 &21 <br />2. Contemporaneous Reclamation 100 <br />3. Approximate Original Contour 102(a)(1) <br />4. Highwall Elimination 102(a)(2) <br />5. Steep Slopes (includes downslope) 10' <br />6. Handling of Acid & Toxic MateriaLs 102(c) <br />7. Stabilization (rills and gulli•s) 95(b) <br />E. Excess Spoil Disposal (316,117.71..:74) <br />1. Placerrr...nt. 71(e) <br />7. Drainage Control 71(f) <br />3. Surface Stabilization. 71 <br />4. InTecticen & Certifrations 7 1(h) <br />F. CoalMine Waste (Refuse Pile.sampoundinents) -816117.81-84) <br />1. Drainage Centro' . . .83(a) <br />2. Surface Stabilization S3(b) <br />3. Placement 83(c) <br />4. Iii-Tections and Certifications 83(d) <br />5. Impounding tructures 84 <br />G. Use of Explosives , (8161817.61-68) <br />61fc) <br />1. Blaaer Certification <br />2. Distan-... Prohibitions 61(d) <br />3. Blaa Survey.:Schedule 62-64 <br />4. Warnings & Records 66 & 68 <br />5. Control of Adverse Effects 67 <br />H. Subsidence Control Plan (317.121-122) <br />I. Roads (816117.150-151) <br />1. Road Construction 1 <br />2. Certification <br />3. Drainage 151(a) . <br />150(b)-151(d) <br />4. Surfacing and Maintmance 150(e)-151(d) <br />5. Reclamation 150(f) <br />J. Signs & Markers 8161817.11) <br />1. qips. 11(a),(b)&(c) <br />2, Mark-rs 11(a),(19,(d),(e).&(f) <br />K. Distance Prohibitions (761.11) <br />L. Revegetation (8167817.111-116) <br />1. Vezetative Cover 111 &.116 <br />2. Timing 112 <br />M. Postmining Land Use (316!817.133) <br />Page 2 of <br />Revised October 1, 2010 <br />