Laserfiche WebLink
vim 16 . 2 18Fd8.Rso.t.4.m..td668. <br />0.886 <br />A <br />B B <br />'rm.... <br />.. <br />_ <br />ter 1062r <br />« @v .4 @3r <br />4 @r 0445!: <br />nor .. §177 <br />_` 1355.aa4 <br />• Cane%. <br />/ <br />00•245, <br />Fpvlb <br />1/AFAI500. <br />G.A.. <br />O0e15 <br />Forfar <br />had.: <br />Fr.arR <br />E 0 <br />»•C_ <br />• non <br />0C_ <br />Fes: <br />....lac <br />D <br />43- u@.'• <br />.8, w@r <br />le Fes'4 <br />0 <br />r <br />12 8 <br />9 8 6 ' 8 a u <br />a r.••c <br />G <br />em @r 0450. <br />1. @r r @ r <br />U m <br />s@T ..4 <br />6 •e86688.18rtd <br />a u <br />x <br />U <br />• <br />• <br />A \ � - ` A' <br />HOLLOW CORE <br />SHAFT CLOSURE <br />HOLLOW CORE SHAFT CLOSURE <br />(SECTION A -A') <br />raced) ` <br />C <br />(Srdc) (Fmot) <br />HOLLOW CORE SHAFT CLOSURE <br />FORMWORK DESIGN <br />FORM DESIGN CHART <br />Fts• 18828 <br />8.8 86am swats <br />w .6 <br />• x a <br />s x u <br />y..R��a <br />r.m. gq�e�teme[I <br />.ir l+Yel.L a k <br />C 0/10.5.15.8710•150021 <br />HOLLOW CORE SHAFT <br />CLOSURE FOOTING DESIGN <br />Page 38 <br />ti Rmelh k Are d. AAA Apo,. <br />ea a FOOTING <br />SECTION (X -X') <br />IC <br />HOLLOW CORE SHAFT <br />CLOSURE SLAB DESIGN <br />tea. <br />SLAB SECTION <br />(X <br />SLAB DESIGN CHARTS <br />basaataset <br />INACITVF MINE RC{' AM.aTION PROGRAM <br />•��,��.�...a..r..� STANDARD DRAWING No. 2 <br />HOLLOW GORE WAFT CLOSURE <br />x= ]s cra <br />Estimated cost per closure per conversations with DRMS, IMP Section: <br />• Estimated at $4,500.00 per shaft X 2 shafts = $9,000.00. <br />(Please see note above) <br />We do not anticipate mine drainage or the necessity of a hydraulic plug to prevent mine <br />drainage. The workings will be filled with dewatered tails (paste backfill) with cement added for <br />structural support. Therefore, the proposed entrance closures should be adequate. <br />(2) An estimate of the actual costs to reclaim the site based on what it would cost <br />the State of Colorado using an independent contractor to complete reclamation: <br />A general estimate of site reclamation is approximately $31,150 based on the average for other <br />sites of similar nature. The Applicant understands the DRMS prefers to calculate its estimate for <br />site reclamation using its highly detailed and sophisticated bond estimation program. <br />