Laserfiche WebLink
• <br />OR, <br />Wes <br />me <br />1. <br />N6136 KW <br />.10 14 <br />urn W. <br />W 126 <br />C 15 690 <br />W 16.6166.6 <br />mmuw e•tem a.srAcoawxr...mami <br />BEAM DESIGN <br />TABLE <br />DETAIL A <br />BEAM SEAT <br />DETAIL B <br />OPTIONAL PANEL <br />FOOTINGS <br />i nr rrw v..0 awn.. <br />4 <br />DETAIL C <br />SECTION AND TIE <br />PLATE DETAIL <br />pe n.n'i.'+w.ma ... te wawa <br />ass. aaaftowl .mn....awa <br />may k ma macrame ...km tm *A, <br />ms4 dd.. era a ad=age x.m.r,mgmt mama am3 <br />�comACIM aas e.a.pmme w+em. h..mows <br />amraaQasIdeal* NM sprokm, mime <br />m ®m pummel r mkt, psalm. m tam a.;sy, and <br />/ 4m <br />Page 37 <br />Sa®.;asa:.ru®a: <br />'°°a•�ms =d GENERAL NOTES <br />rab maemr <br />meMe.maims. Sad .I ra.n <br />me.saea� <br />• .aar.aa .rr <br />dm rm.. Mam <br />a ad..me. <br />ls ▪ mp�m.®S.N...1mem <br />msanm..ab awns a.* <br />3 Ca o °m <br />mm ®. <br />amq.m.=..W on.am wmar.y <br />bYa m fm■mmmamers. <br />`mmiem yk tonal <br />d * mv <br />�w�..ma t m.�. <br />and .tom gaga .d!maim <br />® .r Ins,aa.s.,as aa... <br />npmae <br />uan F <br />�.. A itmmimd <br />aomrmem. aas. <br />sa.a. was aam,,, <br />Estimated cost per closure per conversations with DRMS, IMP Section: <br />• $750.00 per panel X 5 panels = $3,750 for both sites <br />• $3,000 site prep and installation X 2 sites = $6,000 <br />• Estimated total two shafts = $9,750.00 <br />PRECAST CONCRETE <br />PANEL CLOSURE <br />helms <br />Trim a <br />*sea uptake <br />.�. �. <br />� ® =amae�aaa <br />aa�.. <br />mck mamas Io r® Irma <br />On m*�a e ma <br />mu Um los tea h..ba l saaau m <br />+ <br />PRECAST CONCRETE <br />PANEL CLOSURE <br />SECTION A - A' <br />A' <br />INACTIVE MINE RECLAMATION PROGRAM <br />STANDARD DRAWING No. 1 <br />PAECASI CONCRE - PANE_ CLOSURE <br />(Note: Only one shaft will be used as ventilation shaft and secondary escape way. The other is <br />an existing shaft not needed as part of the on -going mining operations.) <br />