Laserfiche WebLink
ROADABLE EQUIPMENT <br />Machine <br />Description <br />Subtotals : <br />$0.00 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Transportation Cycle Time : Non - <br />Roadable <br />Equipment <br />Haul time (hours) = 2.67 <br />Return time (hours) = <br />Loading time (hours) = <br />Unloading time (hours) = <br />Subtotals = <br />JOB TIME AND COST <br />2.67 <br />2.00 <br />1.00 <br />8.33 <br />Total <br />Cost/hour /unit <br />Nearest major city or town within project area region : Grand Junction <br />Roadable <br />Equipment <br />2.67 <br />2.67 <br />NA <br />NA <br />5.33 <br />Fleet Size Haul Trip <br />(No. units) Cost/hr /fleet <br />Total one -way travel distance : <br />Average travel speed : <br />Total job time : <br />Total job cost : <br />Retum Trip <br />Cost/hr /fleet <br />$0.00 <br />Total non - roadable mob /demob cost * : <br />* two round trips with haul rig <br />Total roadable mob /demob cost ** : $0.00 <br />"one round trip, no haul rig <br />120.0 miles <br />45.0 mph <br />$10,460.71 <br />16.67 <br />$10,461 <br />sheet 2 of 2 <br />hours <br />