Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name :CDRMS <br />Task # : 14b <br />Date : 04/17/2009 <br />User : SLB <br />Permit or other job action : Phase I Bond Release <br />EQUIPMENT TRANSPORT RIG COST <br />NON-ROADABLE EQUIPMENT <br />Weight/unit <br />(Tons) <br />Machine <br />Description <br />-Cat D3G XL - 3P <br />-Cat D7R DS Series 11 - 7SU <br />State :Colorado <br />County : Gunnison <br />Site :Bear No. 3 Mine <br />Permit/job # : C-1981-033 <br />Abbreviation : none <br />Filename :CO33-14b <br />sheet 1 of 2 <br />Task description :Mobilize equipment for pond removal and five maintenance trips <br />Truck tractor description <br />Truck trailer description <br />Cost Breakdown <br />:Generic on-highway truck tractor, 6x4, <br />:Generic folding gooseneck, drop deck <br />Available rig capacities : <br />Ownership cost/hour: <br />Operating cost/hour: <br />Operator cost/hour: <br />Helper cost/hour: <br />Total Unit Cost/hour : <br />Shift basis : 1 per day <br />Cost data source : CRG Data <br />diesel powered, 400 HP (2nd half, 2006) <br />equipment trailer (25T, 50T, and 100T) <br />0-25 Tons <br />$16.63 <br />$44.38 <br />$27.66 <br />$0.00 <br />$88.67 <br />26-50 Tons <br />$18.37 <br />$46.13 <br />$27.66 <br />$25.39 <br />$117.55 <br />51+ Tons <br />$22.33 <br />$50.07 <br />$27.66 <br />$25.39 <br />$125.45 <br />9.17 <br />35.17 <br />$11.29 <br />$41.70 <br />$88.67 <br />$117.55 <br />5 <br />1 <br />Subtotals : <br />$499.80 <br />$159.25 <br />$659.05 <br />$443.35 <br />$117.55 <br />$560.90 <br />Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT permit <br />Cost/hr/unit Cost/hr/unit (No. units) Cost/hr/fleet Cost/hr/fleet Cost/fleet <br />$0.00 <br />$0.00 <br />$0.00 <br />