Laserfiche WebLink
Well ID <br />Depth <br />(ft bgs) <br />Casing Diam. <br />(OD; in) <br />Cementing Method <br />TM PAD <br />BH -1 <br />2,400 <br />4.5 <br />Conventional It weight slurry w/ glass beads <br />TM -1 <br />1,976 <br />10.75 <br />Neat cement; tremie placement <br />TM -2 <br />2,290 <br />4.5 <br />Nitrogen foamed cement; downhole pressure <br />TM -3 <br />2,215 <br />4.5 <br />Nitrogen foamed cement; downhole pressure <br />TM -4 <br />1,907 <br />7.625 <br />Nitrogen foamed cement; downhole pressure <br />TM -5 <br />2,294 <br />4.5 <br />Nitrogen foamed cement; downhole pressure <br />TM -6 <br />2,292 <br />4.5 <br />Nitrogen foamed cement; downhole pressure <br />MWP1 (Pad) <br />MWP1 -L3 <br />1,874 <br />4.33 <br />Neat cement; tremie placement <br />MWP2 (Pad) <br />MWP2 -BG <br />1,076 <br />5.5 <br />Neat cement; tremie placement <br />MWP2 -L3 <br />1,824 <br />5.5 <br />Neat cement; tremie placement <br />MWP2 -WS <br />2,420 <br />5.5 <br />Neat cement; tremie placement <br />HB Pad <br />HB -L3 <br />1,820 <br />5.5 <br />Neat cement; tremie placement <br />5. Provide data on bottom hole completions. <br />Please see attached Figure VI-1 (T-1P Well Completion Diagram) <br />6. Provide data on well stimulation used. <br />No well stimulation used. <br />III. Description of Surface Equipment <br />1. Provide data and a sketch of holding tanks, flow lines, filters, and injection pump. <br />The production /injection well T -1P is a component of a complex oil -shale research testing program. The <br />well and surface facilities associated with the testing program are shown in Figure III -1. <br />IV. Monitoring Systems <br />1. Provide data on recording and nonrecording injection pressure gauges, casing- tubing annulus <br />pressure gauges, injection rate meters, temperature meters, and other meters or gauges. <br />Please refer to Part II. Specific Permit Conditions, Section A. Well Construction requirements, 3. <br />Sampling and Monitoring Devices of the UIC Permit and the Injection Well Monitoring Program specified <br />in the Statement of Basis of the UIC permit <br />2. Provide data on constructed monitor wells such as location, depth, casing diameter, method of <br />cementing. <br />Monitor wells are located as shown in Figure IV -1 and described as follows: <br />V. Logging and Testing Results <br />