Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : 005 <br />Date : 04/17/2009 <br />User: SLB <br />Agency or organization name : CDRMS <br />Permit or other job action : Phase 1 Bond Release <br />Task description : Regrade ditches <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />Ownership cost/hour : <br />Operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />State :Colorado <br />County : Gunnison <br />Site :Bear No. 3 <br />Machine description : Cat 325C L <br />$38.60 <br />$49.54 <br />$32.96 <br />$121.11 <br />Utilization % <br />NA <br />100 <br />NA <br />Permit/job # : C- 1981 -033 <br />Abbreviation : none <br />Filename :CO33 -005 <br />Horsepower: 140 <br />Weight (MT) : 28.18 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : $121.11 <br />MATERIAL QUANTITIES <br />Initial <br />volume : <br />330 <br />HOURLY PRODUCTION <br />CCY <br />Source of estimated volume :Map 11 -1 <br />Job Condition Correction Factors <br />Site altitude : 6,000 feet <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />$0.378 per LCY <br />Swell <br />factor : <br />Source of estimated swell factor :Division estimate <br />Unadjusted hourly unit production : <br />Adjusted hourly unit production : <br />Adjusted hourly fleet production : <br />1 excavator(s) <br />1.125 <br />386.42 LCY /hour <br />320.73 LCY /hour <br />320.73 LCY /hour <br />Loose <br />volume : <br />371 <br />LCY <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty) <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.29 minutes <br />Bucket Capacity <br />Rated bucket capacity : 2.22 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90 %) <br />Adjusted bucket capacity : 1.89 LCY <br />Altitude adjustment : <br />Job efficiency adjustment : <br />Net job correction : <br />Total job time : <br />Total job cost : <br />1.00 <br />0.83 <br />0.83 <br />1.16 <br />$140 <br />Source <br />(Cat HB) <br />(1 shift/day) <br />multiplier <br />hours <br />