Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : 004 <br />Date : <br />User: <br />04/17/2009 <br />SLB <br />Agency or organization name : CDRMS <br />Permit or other job action : Phase 1 Bond Release <br />Task description :Rip portal bench, access road, facilities areas <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : NA <br />Area : <br />3.80 <br />HOURLY PRODUCTION <br />Cost Breakdown : Ownership cost/hour : <br />Dozer operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Source of estimated quantity :44% of original acreage figure taken from Map 10 <br />Source of estimated load factor :NA <br />Alternate methods - <br />Seismic : Seismic velocity : <br />Unadjusted production : <br />Area : Avg. ripping depth : <br />Average ripping width : <br />Average ripping length : <br />Average dozer speed : <br />Average maneuver time : <br />Production per unit area : <br />Unadjusted production <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />State :Colorado <br />County : Gunnison <br />Site : Bear No. 3 <br />Basic machine : Cat D7R DS Series 11- 7SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3 -shank ripper <br />NA Load factor : <br />acres Rip depth (ft) : <br />NA feet/second <br />NA cu. yds. /hour <br />2.00 <br />6.50 <br />200.00 <br />88.00 <br />0.25 <br />0.710 <br />feet/pass <br />feet/pass <br />feet/pass <br />feet/minute <br />minutes /pass <br />acres /hour <br />: 2,290.29 cu. yds. /hour <br />1 <br />$0.074 <br />dozer(s) <br />per cu. yd. <br />$46.68 <br />$56.19 <br />$4.30 <br />$32.78 <br />$139.95 <br />Permit/job # : C- 1981 -033 <br />Abbreviation : none <br />Filename :CO33 -004 <br />Utilization <br />NA <br />100 <br />100 <br />NA <br />Selected estimating method : Area <br />NA Bank volume : <br />2.00 <br />Job Condition Correction Factors - <br />Unadjusted production <br />per selected method : 2,290.29 cu. yds. /hour <br />Site altitude : <br />Altitude adjustment : <br />Job efficiency factor : <br />Net job correction : <br />Horsepower: 240 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : <br />$139.95 <br />NA BCY <br />Volume : 12,261 BCY or CCY <br />6,000 feet <br />1.00 (Cat HB) <br />0.83 (1 shift/day) <br />0.83 multiplier <br />Adjusted unit production : 1,900.94 cu. yds. /hour <br />Adjusted fleet production : <br />1,900.94 cu. yds. /hour <br />Total job time : 6.45 hours <br />Total job cost : <br />$ <br />