My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-21_REVISION - C1981033
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981033
>
2009-04-21_REVISION - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:47 PM
Creation date
10/14/2011 10:57:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
REVISION
Doc Date
4/21/2009
Doc Name
Preliminary Adequacy Review
From
Susan Burgmaier
To
Joe Dudash
Type & Sequence
SL4
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : <br />Date : <br />User: <br />Cost Breakdown : <br />002 <br />04/17/2009 <br />SLB <br />HOURLY EQUIPMENT COST <br />Ownership cost/hour : <br />Operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 3,490 LCY <br />Source of estimated swell factor :NA <br />CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />State :Colorado <br />County : Gunnison <br />Site :Bear No. 3 <br />Agency or organization name : CDRMS <br />Permit or other job action :Phase I Bond Release <br />Task description :Backfill and regrade portal bench and access road <br />Machine description : Cat 325C L <br />$38.60 <br />$49.54 <br />$32.96 <br />$121.11 <br />Utilization % <br />NA <br />100 <br />NA <br />Swell <br />factor : NA <br />Permit/job # : C- 1981 -033 <br />Abbreviation : none <br />Filename :CO33 -002 <br />Loose <br />volume : <br />Source of estimated volume :Operator estimate - 44% of original volume <br />Horsepower: <br />Weight (MT) : <br />Shift basis : <br />Data source : <br />Total fleet cost/hour : <br />3,490 LCY <br />140 <br />28.18 <br />1 per day <br />(CRG) <br />$121.11 <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty) <br />Basic job condition description : BELOW AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.34 <br />Bucket Capacity <br />Rated bucket capacity : <br />Bucket fill factor : <br />Adjusted bucket capacity : <br />2.22 <br />0.85 <br />1.89 <br />Job Condition Correction Factors <br />Site altitude : 6,000 feet <br />Unadjusted hourly unit production : <br />Adjusted hourly unit production : <br />Adjusted hourly fleet production : <br />LCY (heaped) Bucket size class : <br />Hard, tough clay (80% - 90 %) <br />LCY <br />Altitude adjustment : <br />Job efficiency adjustment : <br />Net job correction : <br />337.97 <br />280.52 <br />280.52 <br />LCY /hour <br />LCY /hour <br />LCY /hour <br />medium <br />1.00 <br />0.83 <br />0.83 <br />minutes <br />Source <br />(Cat HB) <br />(1 shift/day) <br />multiplier <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />1 excavator(s) <br />$0.432 per LCY <br />Total job time : <br />Total job cost : <br />12.44 <br />$1,507 <br />hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.