Laserfiche WebLink
STRUCTURE OR ITEM DESCRIPTION <br />DIMENSIONS <br />DEMOLITION DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT COST <br />TOTAL COST <br />Chain link fence <br />920 lin. Ft. <br />Means 02 41 13.60 1700 <br />920 <br />LF <br />$2.50 <br />$2,300.00 <br />Gates <br />20' opening <br />Means 02 41 13.62 0400 <br />1 <br />EA <br />$111.50 <br />$111.50 <br />Disposal <br />NA <br />Means 02 41 13.33 4450 <br />20 <br />CY <br />$7.18 <br />$143.60 <br />Culvert 5 - inlet to sediment pond <br />18" x 50' <br />Means 02 41 13.40 0160 <br />50 <br />LF <br />$2.87 <br />$143.50 <br />- excavation /backfill of culvert <br />Division estimate <br />50 <br />LF <br />$0.25 <br />$12.50 <br />Outlet pipes for treatment pond <br />2 - 6" x 175' <br />Means 02 41 13.40 0100 <br />350 <br />LF <br />$1.43 <br />$500.50 <br />Inlet pipe for treatment pond <br />12" x 150' <br />Means 02 41 13.40 0150 <br />150 <br />LF <br />$1.92 <br />$288.00 <br />- excavation / backfill of culvert <br />Division estimate <br />150 <br />LF <br />$0.25 <br />$37.50 <br />Outlet pipe for sediment pond <br />12" x 40' <br />Means 02 41 13.40 0150 <br />40 <br />LF <br />$1.92 <br />$76.80 <br />Subtotal <br />$3,613.90 <br />City Cost Index = 105.7% <br />$205.99 <br />Task Total <br />$3,819.89 <br />TASK # 008 <br />DEMOLITION WORK <br />Bear No. 3 Mine C- 1981 -033 <br />Phase I Release <br />April 17, 2009 <br />